Close Menu
Daily Guardian
  • Home
  • News
  • Politics
  • Business
  • Entertainment
  • Lifestyle
  • Health
  • Sports
  • Technology
  • Climate
  • Auto
  • Travel
  • Web Stories
What's On

Ritedose Appoints Carolyn Berg as New Vice President of Strategic Growth

September 10, 2026

ESGold Advances Montauban Commissioning With Arrival of Key Processing Equipment

September 10, 2026

Coppernico Signs Drill Contract for Phase 2 Drill Program at Sombrero

September 10, 2026

Muon Space Achieves World-First: Zinc Propellant Hall-Effect Thruster Successfully Fires in Space

September 10, 2026

Shock Top and Auntie Anne’s® Take Over Tailgate Season with the Return of Shock Top Twisted Pretzel Wheat and the Limited-Edition TWIST Vest

September 10, 2026
Facebook X (Twitter) Instagram
Finance Pro
Facebook X (Twitter) Instagram
Daily Guardian
Subscribe
  • Home
  • News
  • Politics
  • Business
  • Entertainment
  • Lifestyle
  • Health
  • Sports
  • Technology
  • Climate
  • Auto
  • Travel
  • Web Stories
Daily Guardian
Home » Launch of the second phase of the Õielehe apartments development project (Rae parish, Estonia)
Press Release

Launch of the second phase of the Õielehe apartments development project (Rae parish, Estonia)

By News RoomJanuary 27, 20262 Mins Read
Launch of the second phase of the Õielehe apartments development project (Rae parish, Estonia)
Share
Facebook Twitter LinkedIn Pinterest Email

OÜ Merko Kodud, part of the AS Merko Ehitus group, has decided to launch the second phase of the Õielehe development project in Rae parish in Jüri. As part of this, three apartment buildings with a total of 33 apartments will be completed in the spring of 2027 at the addresses Õie 6, Õie 8 and Õie 10. Sales of apartments will also begin in a five-apartment terraced house, which will be built at the address Õie 1.

The sizes of the apartments in the two-story A-energy class apartment buildings of Õielehe homes (merko.ee/oielehe) range from 50 to 102 square meters, and prices per square meter start at 3,275 euros. The sizes of the two-story A-energy class apartments in the terraced house range from 128 to 144 square meters, and prices per square meter start at 3,363 euros.

Each apartment in the apartment buildings has a balcony or terrace. The apartments in the townhouse have two terraces and two parking spaces. The residential buildings have a courtyard with lush greenery and recreation and play areas. The car parking spaces are ready to install an electric car charging point.

The total development volume of the Õielehe project includes the construction of 121 apartments in ten apartment buildings and 23 homes in four townhouses. The first two buildings in the block at Õie 2 and Õie 4 were completed in the spring of 2025.

OÜ Merko Kodud (merko.ee/kodud) is Estonia’s best-known and most trusted residential real estate developer. To ensure the best quality, convenience and assurance for home buyers, Merko manages all phases of the development: planning, design, construction, sales and warranty service.

Additional information: CEO of OÜ Merko Kodud, Mr. Indrek Tarto, phone: +372 680 5105.

Urmas Somelar
Head of Finance
AS Merko Ehitus
+372 650 1250
[email protected]

AS Merko Ehitus (group.merko.ee) group companies construct buildings and infrastructure and develop real estate. We create a better living environment and build the future. We operate in Estonia, Latvia, and Lithuania. As at the end of 2024, the group employed 605 people, and the group’s revenue for 2024 was EUR 539 million.

  • Õielehe apartment building
  • Õielehe terraced house

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email

Keep Reading

Ritedose Appoints Carolyn Berg as New Vice President of Strategic Growth

ESGold Advances Montauban Commissioning With Arrival of Key Processing Equipment

Coppernico Signs Drill Contract for Phase 2 Drill Program at Sombrero

Muon Space Achieves World-First: Zinc Propellant Hall-Effect Thruster Successfully Fires in Space

Shock Top and Auntie Anne’s® Take Over Tailgate Season with the Return of Shock Top Twisted Pretzel Wheat and the Limited-Edition TWIST Vest

Austin Roofing Completes Final 11 Buildings Concluding its Award Winning 26-building Portfolio

Zacatecas Silver Expands Oso Negro to Over 3 Kilometres of Mapped Gold-Silver Veins; Phase Two Rock Chip Sampling Returns up to 20.3 g/t Gold and 3,480 g/t Silver

Goliath Intersects 26.80 g/t Au Over 2.30 Meters Within 14.28 g/t Au Over 4.32 Meters From The New Volcanic Wedge Zone Between The Bonanza And Golden Gate Zones That Remains Open For Expansion, On The High-Grade Gold Surebet Discovery, Golden Triangle, B.C.

Osisko Intersects 256 Metres Averaging 0.85% Cu at Gaspé

Editors Picks

ESGold Advances Montauban Commissioning With Arrival of Key Processing Equipment

September 10, 2026

Coppernico Signs Drill Contract for Phase 2 Drill Program at Sombrero

September 10, 2026

Muon Space Achieves World-First: Zinc Propellant Hall-Effect Thruster Successfully Fires in Space

September 10, 2026

Shock Top and Auntie Anne’s® Take Over Tailgate Season with the Return of Shock Top Twisted Pretzel Wheat and the Limited-Edition TWIST Vest

September 10, 2026

Latest News

Austin Roofing Completes Final 11 Buildings Concluding its Award Winning 26-building Portfolio

September 10, 2026

The variable aperture isn’t the cool part of the iPhone 18 Pro’s camera

September 10, 2026

Zacatecas Silver Expands Oso Negro to Over 3 Kilometres of Mapped Gold-Silver Veins; Phase Two Rock Chip Sampling Returns up to 20.3 g/t Gold and 3,480 g/t Silver

September 10, 2026
Facebook X (Twitter) Pinterest TikTok Instagram
© 2026 Daily Guardian Canada. All Rights Reserved.
  • Privacy Policy
  • Terms
  • Advertise
  • Contact

Type above and press Enter to search. Press Esc to cancel.

Go to mobile version