Close Menu
Daily Guardian
  • Home
  • News
  • Politics
  • Business
  • Entertainment
  • Lifestyle
  • Health
  • Sports
  • Technology
  • Climate
  • Auto
  • Travel
  • Web Stories
What's On

Apple will reportedly debut its first touchscreen MacBook in three weeks

October 8, 2026

Hamilton rocked by 2 suspected home explosions, 3 people hospitalized

October 8, 2026

BC NDP promises to freeze car insurance rates for 3 years if elected

October 8, 2026

Mia Goth files for divorce from Shia LaBeouf after 10 years of marriage

October 8, 2026

California is trying to shut down robot vs. human cage matches

October 8, 2026
Facebook X (Twitter) Instagram
Finance Pro
Facebook X (Twitter) Instagram
Daily Guardian
Subscribe
  • Home
  • News
  • Politics
  • Business
  • Entertainment
  • Lifestyle
  • Health
  • Sports
  • Technology
  • Climate
  • Auto
  • Travel
  • Web Stories
Daily Guardian
Home » Acrow Solution Maintains Uninterrupted Access During Bridge Rehabilitation in Brownsburg-Chatham, Quebec
Press Release

Acrow Solution Maintains Uninterrupted Access During Bridge Rehabilitation in Brownsburg-Chatham, Quebec

By News RoomJune 17, 20263 Mins Read
Acrow Solution Maintains Uninterrupted Access During Bridge Rehabilitation in Brownsburg-Chatham, Quebec
Share
Facebook Twitter LinkedIn Pinterest Email

TORONTO, June 17, 2026 (GLOBE NEWSWIRE) — Acrow, a leading international bridge engineering and supply company, noted today it has designed and supplied a modular steel bridge to maintain safe access during a bridge rehabilitation project in the residential community of Brownsburg-Chatham, Québec. Acrow’s bridge was installed on Rue Principale over Rivière de l’Ouest, to temporarily replace an aging structure owned by the Ministère des Transports et de la Mobilité durable (MTMD), which was closed in December 2024 for safety reasons.

Originally built in 1940, the Henri-Raby Bridge had reached the end of its service life. The structure had been subject to load restrictions since 2022 to ensure it met its load-bearing capacity. The bridge is a vital link for the region’s residents. To guarantee safe and uninterrupted access throughout the planning and design phase of the bridge replacement project, a temporary bridge was deemed necessary, and a modular steel solution from Acrow was selected.

The temporary structure was supplied as a rental to contractor Maurécon Inc. and assembled and installed by Gelco Construction Inc. The 180-foot (54.86 m)-long, 18-foot (5.5 m)-wide bridge features an epoxy aggregate deck and was designed to a Live Load of CL-625. It was installed using a crane assisted launch method, allowing for efficient placement while minimizing impacts to the surrounding environment. The structure accommodates both vehicles and pedestrians and carries single-lane, bi-directional traffic controlled by a traffic signal. The bridge is expected to remain in place throughout most of 2026.

“Acrow’s modular steel bridge is providing a safe and reliable solution to maintaining access in Brownsburg-Chatham throughout this essential rehabilitation effort,” said Jason Rosen, Business Development Manager, Quebec & Atlantic Region. “In addition to minimizing impacts to travelers, the temporary structure is allowing construction to proceed efficiently.”

“This route plays an important role in the region’s transportation network,” added Oliver Radack, Director of Business Development & Operations, Acrow Canada. “Delivering a fully operational bridge within weeks highlights the rapid-response capabilities that modular steel solutions provide to agencies managing complex infrastructure projects.”

About Acrow

Acrow has been serving the transportation and construction industries for more than 75 years with a wide range of modular steel bridging solutions for permanent, temporary, military and emergency use. Acrow’s extensive international presence includes leadership in the development and implementation of bridge infrastructure projects in over 150 countries across Africa, Asia, the Americas, Europe and the Middle East. For more information, please visit www.acrow.com.

Media contact:
Tracy Van Buskirk
Marketcom PR
Main: (212) 537-5177, ext. 8; Mobile: (203) 246-6165
[email protected]

A photo accompanying this announcement is available at https://www.globenewswire.com/NewsRoom/AttachmentNg/41587138-e9da-44dc-8813-a98c687703ac

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email

Keep Reading

Access Denied

Fleming College advances plans for new healthcare program, announces $500,000 gift

Coinstore to List Agent AI Cash ($AAIC), Connecting AI-Powered Finance with Everyday Digital Asset Utility

LMSCapitalGroup Details AI Investment Infrastructure for Portfolio Data Management

Classic Never Fades | Make It Yours: 2026 iCAUR International User Summit Announces Official Theme

WHYY Celebrates National Honors for Fresh Air’s Terry Gross and Tonya Mosley

eXp Realty Launches ShowGo, a New Platform for Agent-to-Agent Showing Coverage

TurbineOne Selected to Expand Frontline AI Across the U.S. Marine Corps

Mortgage Rates Average 7.40%

Editors Picks

Hamilton rocked by 2 suspected home explosions, 3 people hospitalized

October 8, 2026

BC NDP promises to freeze car insurance rates for 3 years if elected

October 8, 2026

Mia Goth files for divorce from Shia LaBeouf after 10 years of marriage

October 8, 2026

California is trying to shut down robot vs. human cage matches

October 8, 2026

Latest News

Polar bear cub ready for visitors at Winnipeg zoo, as poll opens for his name

October 8, 2026

Halle Berry’s daughter responds to child abuse allegations against mom

October 8, 2026

Tim Cook says ‘I’m not meddling’ in the new Apple CEO’s business

October 8, 2026
Facebook X (Twitter) Pinterest TikTok Instagram
© 2026 Daily Guardian Canada. All Rights Reserved.
  • Privacy Policy
  • Terms
  • Advertise
  • Contact

Type above and press Enter to search. Press Esc to cancel.

Go to mobile version