Close Menu
Daily Guardian
  • Home
  • News
  • Politics
  • Business
  • Entertainment
  • Lifestyle
  • Health
  • Sports
  • Technology
  • Climate
  • Auto
  • Travel
  • Web Stories
What's On

Saskatoon Police Service welcomes new electronic storage detection dog

March 21, 2026

Saskatoon woman starts organization for neurological disorder support

March 21, 2026

ICE detains B.C. mom, daughter in Texas, amid bumpy road to citizenship

March 20, 2026

Anker’s Qi2 MagGo Power Bank is down to its best price in months

March 20, 2026

Canadians mark Eid al-Fitr amid ‘growing concerns’ from global tensions

March 20, 2026
Facebook X (Twitter) Instagram
Finance Pro
Facebook X (Twitter) Instagram
Daily Guardian
Subscribe
  • Home
  • News
  • Politics
  • Business
  • Entertainment
  • Lifestyle
  • Health
  • Sports
  • Technology
  • Climate
  • Auto
  • Travel
  • Web Stories
Daily Guardian
Home » MAX Power’s First Drill Hole Supports New Lithium Discovery in Western United States
Press Release

MAX Power’s First Drill Hole Supports New Lithium Discovery in Western United States

By News RoomDecember 21, 20236 Mins Read
MAX Power’s First Drill Hole Supports New Lithium Discovery in Western United States
Share
Facebook Twitter LinkedIn Pinterest Email

VANCOUVER, British Columbia, Dec. 21, 2023 (GLOBE NEWSWIRE) — MAX Power Mining Corp. (CSE: MAXX; OTC: MAXXF; FRANKFURT: 89N) (“MAX Power” or the “Company”) has intersected a thick lithium claystone sequence as well as multiple liquid brine targets in its first diamond drill hole at the Willcox Playa in southeast Arizona. This represents a new discovery with considerable scale and grade potential as MAX Power’s Willcox Property covers a 6-mile-long north-south corridor defined by favorable geophysics and surrounded by excellent infrastructure in the heart of the American West.

Highlights:

  • From the top of the hole to approximately 900 feet, WP-23-01 (drilled vertically) in the northern portion of the property intersected a predominantly claystone sequence;
  • Seven distinct fluid sequences were encountered in WP-23-01 at depths ranging from 67 feet to 1,188 feet. This is considered highly significant in terms of lithium brine potential from non-potable fluids under the Playa;
  • The first drill hole was collared approximately 5 miles southeast of an historic U.S. Geological Survey hole completed in the 1970s and represents the start of first-ever systematic diamond drilling on the Playa;
  • Initial analysis of the claystones using a Laser Induced Breakdown Spectroscopy Z-903 (LIBS) portable handheld tool suggests the lithium mineralization in the claystones is more intense and pervasive than the encouraging results reported by the USGS in its historic test hole to the northwest;
  • The second drill hole, a 1,640-foot step-out to the west, has commenced;
  • Drill samples of the clays and the brine have already been sent to ALS Global in Tucson.

Mr. Peter Lauder, Senior Geologist and Exploration Manager for MAX Power, commented: “Willcox is already showing itself to be quite unique and fascinating based on just the very first drill hole with strong potential for widespread and robust lithium mineralization in thick claystone sequences under the Playa. The exciting wildcard is the potential for lithium mineralization in the fluid sequences, so we eagerly anticipate those results from ALS Global.”

Figure 1: The Willcox Playa

Figure 2: Representative Drill Core
Figure 2 Core Photos

The above photo in Figure 2 is claystone drill core from Willcox Playa hole WP-23-01 (assays pending).

Figure 3: Godbe Drilling’s Core Rig on Hole WP-23-01
Figure 3 Drilling at Willcox Playa

Historical Context

The Willcox Playa, situated approximately 200 miles southeast of Phoenix in Cochise County, was historically referenced by the U.S. Geological Survey (USGS), following limited drilling in the 1970s, as one of the most prospective locations for lithium in the western United States, similar in its potential to Clayton Valley, Nevada, and the lithium brine and claystone deposits that have been identified there. Decades of U.S. Air Force activity in the Willcox Playa has ended, with MAX Power benefiting from first-mover advantage in the area.

Qualified Person

The technical information in this news release has been reviewed and approved by Thomas Clarke, P.Geo., Pr.Sci.Nat, and Director for MAX Power Mining Corp. Mr. Clarke is the Qualified Person responsible for the scientific and technical information contained herein under National Instrument 43-101 standards.

About MAX Power

MAX Power is a dynamic exploration stage resource company targeting domestic lithium resources to advance North America’s renewable energy prospects. MAX has also entered into a cooperative research and development agreement with the University of California Lawrence Berkeley National Laboratory (LBNL) to develop state-of-the-art direct lithium extraction (DLE) technologies for brine resources.

On behalf of the Board of Directors                                             
     
“Rav Mlait”- CEO
MAX Power Mining Corp.
[email protected]
Tel: 778-655-9266
  MarketSmart Communications
Tel: 877-261-4466.
     

Forward-Looking Statement Cautions

This press release contains certain “forward-looking statements” within the meaning of Canadian securities legislation, relating to exploration, drilling, mineralization and historical results on the Property; the interpretation of drilling and assay results, the results of any future drilling program, mineralization and the discovery mineralization (if any); plans for future exploration and drilling and the timing of same; the merits of the Willcox Playa Property; the potential for lithium within the Willcox Playa region; ability to access Property; ability to extract resources from the Property, commentary as it related to the opportune timing to explore lithium exploration and any anticipated increasing demand for lithium; any results and updates thereto as it relates to the USGS report; the Company’s concentration hypothesis; closing of the transaction; future press releases by the Company; and funding of any future drilling program. Although the Company believes that such statements are reasonable, it can give no assurance that such expectations will prove to be correct. Forward-looking statements are statements that are not historical facts; they are generally, but not always, identified by the words “expects,” “plans,” “anticipates,” “believes,” “interpreted,” “intends,” “estimates,” “projects,” “aims,” “suggests,” “often,” “target,” “future,” “likely,” “pending,” “potential,” “goal,” “objective,” “prospective,” “possibly,” “preliminary”, and similar expressions, or that events or conditions “will,” “would,” “may,” “can,” “could” or “should” occur, or are those statements, which, by their nature, refer to future events. The Company cautions that forward-looking statements are based on the beliefs, estimates and opinions of the Company’s management on the date the statements are made, and they involve a number of risks and uncertainties. Consequently, there can be no assurances that such statements will prove to be accurate and actual results and future events could differ materially from those anticipated in such statements. Except to the extent required by applicable securities laws and the policies of the CSE, the Company undertakes no obligation to update these forward-looking statements if management’s beliefs, estimates or opinions, or other factors, should change. Factors that could cause future results to differ materially from those anticipated in these forward-looking statements include risks associated with possible accidents and other risks associated with mineral exploration operations, the risk that the Company will encounter unanticipated geological factors, risks associated with the interpretation of assay results and the drilling program, the possibility that the Company may not be able to secure permitting and other governmental clearances necessary to carry out the Company’s exploration plans, the risk that the Company will not be able to raise sufficient funds to carry out its business plans, and the risk of political uncertainties and regulatory or legal changes that might interfere with the Company’s business and prospects. The reader is urged to refer to the Company’s Management’s Discussion and Analysis, publicly available through the Canadian Securities Administrators’ System for Electronic Document Analysis and Retrieval (SEDAR) at www.sedar.com for a more complete discussion of such risk factors and their potential effects.

Figure 1: The Willcox Playa is available at https://www.globenewswire.com/NewsRoom/AttachmentNg/327544a3-3342-45a6-91c2-89ba96faf535

Figure 2: Representative Drill Core is available at https://www.globenewswire.com/NewsRoom/AttachmentNg/c42e2bdf-8ced-4b49-93d1-25bad81b210c

Figure 3: Godbe Drilling’s Core Rig on Hole WP-23-01 is available at https://www.globenewswire.com/NewsRoom/AttachmentNg/fa300ea1-d408-4097-b1ea-57bf930f10f7

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email

Keep Reading

GLOBAL Marks World Down Syndrome Day with Publication of Milestone Review of New Medical Guideline

Wingman P5 by Brook Gaming: True wireless & near-zero latency for native PS5, PS4 & PC gaming

LGI Homes Celebrates Grand Opening of Goldfields Ranch in Linda, California

Thomas Global Systems Participates in Northrop Grumman 2026 IBCS Supplier Summit

Sasser, Inc. Names Michael Kelly as President of Chicago Freight Car and CF Rail Services

New Rally House Location on Forbes Avenue Opening

Mission Success: Rocket Lab Launches Latest Satellite for Synspective

Memory Lift Safeness Issues Arise: Do NOT Buy from Third-Party Retail Websites to Avoid Side Effects Risk

CityPlace Welcomes Moxies as New Social Dining Destination

Editors Picks

Saskatoon woman starts organization for neurological disorder support

March 21, 2026

ICE detains B.C. mom, daughter in Texas, amid bumpy road to citizenship

March 20, 2026

Anker’s Qi2 MagGo Power Bank is down to its best price in months

March 20, 2026

Canadians mark Eid al-Fitr amid ‘growing concerns’ from global tensions

March 20, 2026

Latest News

Nine months later, the Trump phone still doesn’t exist

March 20, 2026

Quebec premier dismisses Doug Ford’s concerns over province’s EV targets

March 20, 2026

This is Microsoft’s plan to fix Windows 11

March 20, 2026
Facebook X (Twitter) Pinterest TikTok Instagram
© 2026 Daily Guardian Canada. All Rights Reserved.
  • Privacy Policy
  • Terms
  • Advertise
  • Contact

Type above and press Enter to search. Press Esc to cancel.

Go to mobile version