Close Menu
Daily Guardian
  • Home
  • News
  • Politics
  • Business
  • Entertainment
  • Lifestyle
  • Health
  • Sports
  • Technology
  • Climate
  • Auto
  • Travel
  • Web Stories
What's On

Specially-trained ‘bird dogs’ hired to clear geese from FIFA practice pitch

June 22, 2026

Size and a depth guard priorities for Raptors

June 22, 2026

The Steam Machine is the most ambitious game console I’ve ever played

June 22, 2026

MarketWise Announces Premier Partnership with USA Field Hockey

June 22, 2026

Cardtonic Cares Partners With Irede Foundation to Sponsor Prosthetic Limb for Nigerian Schoolgirl

June 22, 2026
Facebook X (Twitter) Instagram
Finance Pro
Facebook X (Twitter) Instagram
Daily Guardian
Subscribe
  • Home
  • News
  • Politics
  • Business
  • Entertainment
  • Lifestyle
  • Health
  • Sports
  • Technology
  • Climate
  • Auto
  • Travel
  • Web Stories
Daily Guardian
Home » W.A. Rasic Construction Completes Pipeline Installation Project Near Picacho Peak, Arizona
Press Release

W.A. Rasic Construction Completes Pipeline Installation Project Near Picacho Peak, Arizona

By News RoomApril 9, 20263 Mins Read
W.A. Rasic Construction Completes Pipeline Installation Project Near Picacho Peak, Arizona
Share
Facebook Twitter LinkedIn Pinterest Email

LONG BEACH, Calif., April 09, 2026 (GLOBE NEWSWIRE) — W.A. Rasic Construction Company has completed a major pipeline installation project near Picacho Peak, Arizona, further demonstrating its ability to deliver complex infrastructure in challenging field conditions.

The Picacho Peak Pipeline Installation project involved the construction of approximately three miles of pipeline through desert terrain alongside an active rail corridor. The work required careful coordination, precise sequencing, and disciplined execution to maintain safety and efficiency within a constrained project environment.

“This project is a good example of the kind of work W.A. Rasic is built to do,” said Len Kody, Marketing & Communications Manager at W.A. Rasic Construction. “It combined scale, coordination, and real field complexity in a demanding environment, and our crews executed it with the kind of focus and discipline that work as this requires.”

The project scope included long linear pipeline installation supported by trenchless construction methods, including horizontal directional drilling (HDD), as well as controlled pipe handling and placement across varying terrain. Crews operated in close proximity to active rail operations, requiring continuous communication, planning, and adherence to strict safety protocols.

Working conditions added another layer of complexity, with crews navigating remote desert access, variable ground conditions, and logistical constraints associated with transporting and staging long pipe sections. Multi-crew coordination played a central role in maintaining steady progress across the corridor while minimizing disruptions to surrounding infrastructure.

Visual documentation from the project highlights the scale and environment of the work, including aerial drone footage of the installation corridor, ground-level views of pipe handling operations, and equipment working against the backdrop of the Arizona desert and surrounding mountain landscape.

The successful completion of the Picacho Peak Pipeline Installation project reflects W.A. Rasic Construction’s continued focus on delivering infrastructure solutions that require strong field execution, detailed planning, and adaptability in complex environments.

Founded in 1978 and headquartered in Long Beach, W.A. Rasic Construction has built a reputation as a leading heavy civil and underground utility contractor. With decades of experience across water, wastewater, energy, and transportation infrastructure, the company continues to deliver projects that support essential systems and long-term regional development.

About W.A. Rasic Construction Company

W.A. Rasic Construction Company, founded in 1978 by Walter A. Rasic, Sr., is a leading utility contractor specializing in underground construction, water, wastewater, power, communication, gas & oil, and heavy civil infrastructure. With over 45 years of experience, W.A. Rasic Construction is trusted by both public agencies and private sector clients across the Western United States for its commitment to quality and long-term partnerships, building a reputation for safety, reliability, and excellence.

Contact Information:

Contact Name: Jeremy Donald
Organization: Silverline Mediaworks
Website: https://www.silverlinemediaworks.com/
Phone number: 720-334-7865
Email: [email protected]

A photo accompanying this announcement is available at https://www.globenewswire.com/NewsRoom/AttachmentNg/68750928-f529-4239-b8f6-b2178da35f05

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email

Keep Reading

MarketWise Announces Premier Partnership with USA Field Hockey

Cardtonic Cares Partners With Irede Foundation to Sponsor Prosthetic Limb for Nigerian Schoolgirl

Rocket Lab Shatters Responsive Space Record: Launches U.S. Space Force VICTUS HAZE Mission in 16 Hours 42 Minutes

Noble Public Adjusting Group Reports Growing Visibility Across AI-Powered Search Platforms for Large-Loss Insurance Claims

An AI Helped Build a Full Online Game World in a Weekend. Then Players Around the World Started Building It Too.

MONAT Recognized with DSA Canada Industry Innovation Award for Pioneering Social Commerce in Direct Selling

Maryland Public Television earns 20 regional Emmy® Awards

Giga Metals Launches Summer Geophysics Program to Advance Attic Zone

MKS Celebrates Opening of Supercenter Factory in Malaysia, Strengthening Semiconductor Manufacturing Capabilities

Editors Picks

Size and a depth guard priorities for Raptors

June 22, 2026

The Steam Machine is the most ambitious game console I’ve ever played

June 22, 2026

MarketWise Announces Premier Partnership with USA Field Hockey

June 22, 2026

Cardtonic Cares Partners With Irede Foundation to Sponsor Prosthetic Limb for Nigerian Schoolgirl

June 22, 2026

Latest News

‘Catastrophe’: Montreal’s West Island residents continue cleanup after heavy flooding

June 22, 2026

Rocket Lab Shatters Responsive Space Record: Launches U.S. Space Force VICTUS HAZE Mission in 16 Hours 42 Minutes

June 22, 2026

Valve will finally let you build your own Steam Machine with SteamOS for desktop

June 22, 2026
Facebook X (Twitter) Pinterest TikTok Instagram
© 2026 Daily Guardian Canada. All Rights Reserved.
  • Privacy Policy
  • Terms
  • Advertise
  • Contact

Type above and press Enter to search. Press Esc to cancel.

Go to mobile version