Close Menu
Daily Guardian
  • Home
  • News
  • Politics
  • Business
  • Entertainment
  • Lifestyle
  • Health
  • Sports
  • Technology
  • Climate
  • Auto
  • Travel
  • Web Stories
What's On

Scotlynn Named Gulfshore Business’ Best Places to Work 2026

June 18, 2026

Redodo Launches Prime Day LiFePO4 Battery Deals and Introduces New Flagship 12V 120Ah Group 24 Bluetooth Battery

June 18, 2026

Verse Raises $54M and Launches “Dispatch Intelligence” to Accelerate Speed to Power for Data Center Developers in Partnership with Calibrant Energy

June 18, 2026

Avalanche Energy Appoints Mustally Hussain as Chief Financial Officer

June 18, 2026

TryHard Holdings (Nasdaq: THH) Expands Nationwide Presence With 23 Venues Across 13 Cities

June 18, 2026
Facebook X (Twitter) Instagram
Finance Pro
Facebook X (Twitter) Instagram
Daily Guardian
Subscribe
  • Home
  • News
  • Politics
  • Business
  • Entertainment
  • Lifestyle
  • Health
  • Sports
  • Technology
  • Climate
  • Auto
  • Travel
  • Web Stories
Daily Guardian
Home » The first fully indoor 500-kilovolt urban substation in Jiangsu Province was put into operation
Press Release

The first fully indoor 500-kilovolt urban substation in Jiangsu Province was put into operation

By News RoomDecember 5, 20242 Mins Read
The first fully indoor 500-kilovolt urban substation in Jiangsu Province was put into operation
Share
Facebook Twitter LinkedIn Pinterest Email

NANJING, China, Dec. 05, 2024 (GLOBE NEWSWIRE) — The Suzhou Yuexi 500-kilovolt Substation Project, a key project for the State Grid Jiangsu Electric Power Co., Ltd. to meet the peak winter demand this year, was officially put into operation on November 29th. This is the first fully indoor 500-kilovolt substation in Jiangsu Province. It can add a transformation capacity of 2 million kilovolt-amperes for Suzhou, providing a strong guarantee for the electricity consumption in Jiangsu and even the Yangtze River Delta region this winter.

To meet the development needs of the regional electricity load and improve the power supply reliability, the State Grid Jiangsu Electric Power utilized the rare urban land resources, demolished the original Yuexi 220-kilovolt substation, and built a new Yuexi 500-kilovolt substation on the original site.

Compared with the planned area of more than 50 mu for a conventional 500-kilovolt substation, the Yuexi 500-kilovolt substation only occupies about 20 mu, which is reduced by more than half. The project adopts a three-row stacked and compact layout with a total height of 23 meters, “compressing” all electrical equipment and devices such as main transformers and gas-insulated metal-enclosed switchgear into one building.

With the substation “installed” indoors, not only is the floor area greatly reduced, but also various green construction concepts are innovatively integrated into this substation. The relevant person in charge of the State Grid Jiangsu Electric Power Engineering Consulting Co., Ltd. Introduced that the installation of rooftop photovoltaics on the distribution device building can reduce carbon dioxide emissions by more than 100 tons and save more than 40 tons of standard coal every year. The construction of an integrated rainwater recycling and utilization device within the station can treat the rainwater in the station area and then use it for greening and irrigation, saving about 3,300 cubic meters of water every year.

Source: The State Grid Jiangsu Electric Power Engineering Consulting Co., Ltd.

A photo accompanying this announcement is available at https://www.globenewswire.com/NewsRoom/AttachmentNg/c4f0b2ad-3693-4cba-a743-74ca0ef9b139


Share. Facebook Twitter Pinterest LinkedIn Tumblr Email

Keep Reading

Scotlynn Named Gulfshore Business’ Best Places to Work 2026

Redodo Launches Prime Day LiFePO4 Battery Deals and Introduces New Flagship 12V 120Ah Group 24 Bluetooth Battery

Verse Raises $54M and Launches “Dispatch Intelligence” to Accelerate Speed to Power for Data Center Developers in Partnership with Calibrant Energy

Avalanche Energy Appoints Mustally Hussain as Chief Financial Officer

TryHard Holdings (Nasdaq: THH) Expands Nationwide Presence With 23 Venues Across 13 Cities

Qnetic Defines “AI-Grade Energy Storage” as New Category  for AI Infrastructure

Hudbay Celebrates Groundbreaking of New Ingerbelle Expansion at Copper Mountain Mine

ONECNA Launches the T4 Electric Scooter: Power, Range, and a Built-In Sound System That Redefines the Ride

GAME ON! ANNOUNCES “GLOBAL GAME, LOCAL IMPACT” SUMMER EVENTS CELEBRATING COMMUNITY, CULTURE, AND OPPORTUNITY AHEAD OF WORLD CUP

Editors Picks

Redodo Launches Prime Day LiFePO4 Battery Deals and Introduces New Flagship 12V 120Ah Group 24 Bluetooth Battery

June 18, 2026

Verse Raises $54M and Launches “Dispatch Intelligence” to Accelerate Speed to Power for Data Center Developers in Partnership with Calibrant Energy

June 18, 2026

Avalanche Energy Appoints Mustally Hussain as Chief Financial Officer

June 18, 2026

TryHard Holdings (Nasdaq: THH) Expands Nationwide Presence With 23 Venues Across 13 Cities

June 18, 2026

Latest News

Qnetic Defines “AI-Grade Energy Storage” as New Category  for AI Infrastructure

June 18, 2026

Funeral to be held for OPP officer fatally struck by car in Hearst, Ont.

June 18, 2026

Gun control groups urge faster ‘protection order’ ineligibility change

June 18, 2026
Facebook X (Twitter) Pinterest TikTok Instagram
© 2026 Daily Guardian Canada. All Rights Reserved.
  • Privacy Policy
  • Terms
  • Advertise
  • Contact

Type above and press Enter to search. Press Esc to cancel.

Go to mobile version