Daily Guardian
  • Home
  • News
  • Politics
  • Business
  • Entertainment
  • Lifestyle
  • Health
  • Sports
  • Technology
  • Climate
  • Auto
  • Travel
  • Web Stories
What's On

Carney calls Trump’s Greenland tariff threats an ‘escalation’

January 18, 2026

Carney agrees ‘in principle’ to Trump’s Gaza peace board

January 18, 2026

Calgary mayor calls for one-year timeline to complete Bearpaw water main twinning

January 18, 2026

Qatar to invest in Canada’s major building projects, Carney says

January 18, 2026

Microsoft’s first Windows 11 update of 2026 stopped some computers from shutting down

January 18, 2026
Facebook X (Twitter) Instagram
Finance Pro
Facebook X (Twitter) Instagram
Daily Guardian
Subscribe
  • Home
  • News
  • Politics
  • Business
  • Entertainment
  • Lifestyle
  • Health
  • Sports
  • Technology
  • Climate
  • Auto
  • Travel
  • Web Stories
Daily Guardian
Home » Primetals Technologies Chosen as Supplier of Electric Arc Furnace Based Steelmaking Plant
Press Release

Primetals Technologies Chosen as Supplier of Electric Arc Furnace Based Steelmaking Plant

By News RoomJanuary 16, 20243 Mins Read
Primetals Technologies Chosen as Supplier of Electric Arc Furnace Based Steelmaking Plant
Share
Facebook Twitter LinkedIn Pinterest Email
Primetals Technologies Chosen as Supplier of Electric Arc Furnace Based Steelmaking Plant
London, Jan. 16, 2024 (GLOBE NEWSWIRE) —

  • Primetals Technologies to supply EAF Ultimate with an annual capacity of 1.6 million tons of liquid steel
  • Comprehensive automation system enables detailed process control and calculation of carbon footprint
  • Huge step for the production of green steel in Austria

voestalpine has placed an order with Primetals Technologies for a 180-ton EAF Ultimate to be implemented at the Austrian steel producer’s site in Linz, Austria. Startup is scheduled for 2027. The EAF Ultimate will be playing a key role in voestalpine’s green transition program “greentec steel.” As a first step in this ambitious decarbonization program, one electric arc furnace will be built at each of voestalpine’s sites, in Linz and Donawitz.

Latest generation of EAF based steelmaking plants

Primetals Technologies will supply the complete EAF Ultimate equipment, a dedusting system, a waste-heat recovery system, electrical grid stabilization, and material handling for alloying materials and additives. The order also includes full Level 1 and 2 automation, a power supply system, and the LiquiRob robotic system, which increases efficiency and occupational safety at the plant.

The EAF Ultimate will be designed to incorporate industry-leading solutions for environmentally friendly steel production. For example, the heat recovery system will convert much of the waste heat into steam, which is then fed back and used in other production units.

“We are very happy to strengthen our close and long-lasting partnership with voestalpine and to support them on their way to becoming CO2-neutral. The EAF Ultimate is part of our latest generation of electric steelmaking plants and is well-known for its raw material flexibility, fully automated operation, advanced control systems, and environmental efficiency. With this technology, voestalpine is set for a future of decarbonized steel production,” says Andreas Viehböck, Head of Upstream Technologies at Primetals Technologies.

In August 2022, Primetals Technologies announced a significant contribution to Salzgitter’s SALCOS green steel transition project in Germany. This collaboration and other recent references as well as expertise in both the production of advanced steel grades and leading automation solutions were the most important factors influencing the decision to choose Primetals Technologies as the supplier for the  new electric arc furnace and meltshop equipment.

State-of-the-art automation system

The automation scope includes the latest generation of the web-based DCS process control system, which unites the engineering and operational teams in the same environment. This system ensures intuitive system operation and best-in-class support in maintenance-related topics. The Level 2 automation system is state-of-the-art, resulting in superior process control and the possibility to calculate the carbon footprint of the electric steelmaking plant.

Global market leader

Headquartered in Linz, Austria, voestalpine is a global steel and technology group and a leading partner to the automotive and consumer goods sectors as well as the aerospace and oil and natural gas industries. The company is also the global market leader in railway systems, steels for the manufacture of tools, and special sections. voestalpine is committed to global climate goals and has a clear plan for decarbonizing steel production via its greentec steel program.

  • EAF Ultimate from Primetals Technologies

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email

Keep Reading

DeFi Protocol Mutuum Finance (MUTM) Progresses Through Roadmap Phase 2 with Halborn Audit Finalized

New Cryptocurrency Mutuum Finance Records 300% MUTM Growth as Phase 7 is Accelerating

New Crypto Mutuum Finance (MUTM) Reaches Over 18,700 Investors and $19.8M Raises as Protocol Launch Nears

NeuroDyne Drops: Sharp Mind, Enhanced Memory, and Lasting Focus – As Nature Intended, Ingredients

Optivell Officially Announced as a Vision Support Formula for Preventive Eye Wellness

Phentermine Over the Counter Alternative 2026 – OTC Appetite Suppressant Search Trend Analysis Positions PhenQ as a Market Leader According to 1200 Doctors

Sugar Clean Drops: Top Blood Sugar Support Supplement for Metabolic Wellness and Energy Support

CryptSync Launches Insured Self-Custody Wallet With Seedless Onboarding and Social Payments

ProCryptoRecovery LTD Unveils Platform, Advancing AI-Driven Crypto Forensics and Compliance-Ready Investigations

Editors Picks

Carney agrees ‘in principle’ to Trump’s Gaza peace board

January 18, 2026

Calgary mayor calls for one-year timeline to complete Bearpaw water main twinning

January 18, 2026

Qatar to invest in Canada’s major building projects, Carney says

January 18, 2026

Microsoft’s first Windows 11 update of 2026 stopped some computers from shutting down

January 18, 2026

Subscribe to News

Get the latest Canada news and updates directly to your inbox.

Latest News

Parts of Trans Canada Highway closed in Manitoba due to blowing snow — again

January 18, 2026

Under Musk, the Grok disaster was inevitable

January 18, 2026

Coinbase pulls its support of the Senate CLARITY Act

January 18, 2026
Facebook X (Twitter) Pinterest TikTok Instagram
© 2026 Daily Guardian Canada. All Rights Reserved.
  • Privacy Policy
  • Terms
  • Advertise
  • Contact

Type above and press Enter to search. Press Esc to cancel.

Go to mobile version