Close Menu
Daily Guardian
  • Home
  • News
  • Politics
  • Business
  • Entertainment
  • Lifestyle
  • Health
  • Sports
  • Technology
  • Climate
  • Auto
  • Travel
  • Web Stories
What's On

Talisker Announces Preliminary Economic Assessment for the Bralorne Gold Project Highlighting C$1.0 Billion After-Tax NPV5% and 31.3% IRR at a Base-Case Gold Price of US$3,500/oz; At US$4,300/oz Spot Gold, C$1.9 Billion After-Tax NPV5% and 67.2% IRR

September 21, 2026

The story of Googlebooks, Google’s new take on laptops

September 21, 2026

IDB Group Convenes Heads of State and Technology Leaders to Advance AI Agenda

September 21, 2026

Pharmacy treatments for Lyme disease cut N.S. emergency visits in half: study

September 21, 2026

I got to see Google’s wild ideas about the future of laptops

September 21, 2026
Facebook X (Twitter) Instagram
Finance Pro
Facebook X (Twitter) Instagram
Daily Guardian
Subscribe
  • Home
  • News
  • Politics
  • Business
  • Entertainment
  • Lifestyle
  • Health
  • Sports
  • Technology
  • Climate
  • Auto
  • Travel
  • Web Stories
Daily Guardian
Home » PCL Construction Modernizes Norwood Water Treatment Plant, Strengthening Water Reliability for 180,000 South Florida Residents
Press Release

PCL Construction Modernizes Norwood Water Treatment Plant, Strengthening Water Reliability for 180,000 South Florida Residents

By News RoomAugust 10, 20263 Mins Read
PCL Construction Modernizes Norwood Water Treatment Plant, Strengthening Water Reliability for 180,000 South Florida Residents
Share
Facebook Twitter LinkedIn Pinterest Email

Project expands storage capacity, upgrades pumping systems and strengthens long-term resiliency while maintaining uninterrupted water service

Norwood Water Treatment Plan

Norwood Water Treatment Plan

Fort Lauderdale, Fla., Aug. 10, 2026 (GLOBE NEWSWIRE) — PCL Construction, Inc. today announces the substantial completion of major infrastructure improvements at the Norwood Water Treatment Plant, a critical facility that provides drinking water to approximately 180,000 residents across South Florida.

Throughout construction, the plant remained fully operational, ensuring uninterrupted water service while the upgrades were completed.
Key project upgrades include:

  • New high-service pump station replaces the plant’s 20-year-old split-case horizontal pumps, originally designed in the late 1960s, to improve reliability and efficiency
  • Modernized pump controls and variable frequency drives (VFDs) with state-of-the-art technology to enhance long-term system performance
  • New 5-million-gallon storage tank to increase water storage capacity and operational flexibility
  • New 450-horsepower pump-and-motor combo to strengthen system reliability
  • Upsized piping, from roughly 18″ to 30″+, to future-proof the facility
  • New workshop and storage building to support ongoing operations and maintenance

“Projects like Norwood are about much more than construction; they’re about protecting an essential public resource,” said Ray Torrejon, district manager for PCL Construction’s civil division. “Communities depend on it every hour of every day. This project required careful planning and close collaboration to modernize critical systems while keeping the facility operating without interruption. We completed the work on schedule and under budget, reflecting the strength of our partnership and our commitment to delivering resilient infrastructure that will serve South Florida for decades.”

The Norwood Water Treatment Plant currently produces approximately 24 million gallons of drinking water each day and has the capacity to produce up to 41 million gallons daily. These improvements strengthen the plant’s ability to meet future demand while providing greater flexibility during periods of peak demand.

One of the project’s most significant milestones was the successful completion of complex 42-inch and 36-inch process pipe tie-ins ahead of schedule. The work required detailed sequencing and coordination to safely integrate.

“The Norwood Water Treatment Plant modernization strengthens the reliability and resilience of our water system for decades to come,” said Hamid R. Nikvan, Public Utilities Director, NMB Water. “This project reflects our commitment to delivering safe, high-quality water and investing in the long-term infrastructure needs of City of North Miami Beach, and we appreciate the collaboration that helped bring it to completion.”

The project reflects PCL’s growing portfolio of resilient water and wastewater infrastructure work across Florida, including:

  • South District Wastewater Treatment Plant (Miami-Dade County): A resiliency project providing backup power to more than 40 substations serving over 800,000 residents.
  • Water Treatment Plant 2 Expansion (Palm Beach County): Supporting PFAS compliance through preconstruction services for an advanced nanofiltration system.
  • Lift Station 317 (City of Boynton Beach): Major rehabilitation of a critical regional wastewater facility while maintaining uninterrupted operations.

###

About PCL Construction: PCL Construction is one of the most respected and accomplished global construction leaders, comprising independent companies operating throughout the United States, Canada, the Caribbean and Australia. With an annual construction volume of $9.9 billion USD, PCL builds projects that shape communities and strengthen infrastructure. The company’s 100% employee ownership model fuels a culture of commitment for clients in the buildings, civil infrastructure,
heavy industrial and solar markets. With a strategic presence in more than 30 major centers, PCL’s leadership teams consistently drive innovation and set new benchmarks for excellence, bringing unparalleled skill to every project. Watch us build at PCL.com.

Contact Info

Angelo Dalmacio
[email protected]
+1 303-365-6413

Attachment

  • Norwood Water Treatment Plan

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email

Keep Reading

Talisker Announces Preliminary Economic Assessment for the Bralorne Gold Project Highlighting C$1.0 Billion After-Tax NPV5% and 31.3% IRR at a Base-Case Gold Price of US$3,500/oz; At US$4,300/oz Spot Gold, C$1.9 Billion After-Tax NPV5% and 67.2% IRR

IDB Group Convenes Heads of State and Technology Leaders to Advance AI Agenda

Bombardier Announces 2025 Winners of its Supplier Recognition Program

New Crypto: Pepeto Announces a DeFi Tools Upgrade While Ethereum Price Prediction Targets $18K and Whale Buying Grows

LGI Homes & Terrata Homes Launches “Make Your Move” National Sales Event with Limited-Time Savings and Incentives

Oliveda International, Inc. (OLVI) Announces Subsidiary Olive Tree People Inc.’s Successful Completion of Demeter Certification Audit for Its First Olive Groves

Blaze Pizza Now Open in El Segundo

VisitMercerCountyPA Highlights Homecoming Shopping Across Mercer County, Pennsylvania

Kimberly A. Boynton Named to NBT Board of Directors

Editors Picks

The story of Googlebooks, Google’s new take on laptops

September 21, 2026

IDB Group Convenes Heads of State and Technology Leaders to Advance AI Agenda

September 21, 2026

Pharmacy treatments for Lyme disease cut N.S. emergency visits in half: study

September 21, 2026

I got to see Google’s wild ideas about the future of laptops

September 21, 2026

Latest News

Bombardier Announces 2025 Winners of its Supplier Recognition Program

September 21, 2026

New Crypto: Pepeto Announces a DeFi Tools Upgrade While Ethereum Price Prediction Targets $18K and Whale Buying Grows

September 21, 2026

LGI Homes & Terrata Homes Launches “Make Your Move” National Sales Event with Limited-Time Savings and Incentives

September 21, 2026
Facebook X (Twitter) Pinterest TikTok Instagram
© 2026 Daily Guardian Canada. All Rights Reserved.
  • Privacy Policy
  • Terms
  • Advertise
  • Contact

Type above and press Enter to search. Press Esc to cancel.

Go to mobile version