Close Menu
Daily Guardian
  • Home
  • News
  • Politics
  • Business
  • Entertainment
  • Lifestyle
  • Health
  • Sports
  • Technology
  • Climate
  • Auto
  • Travel
  • Web Stories
What's On

CNET: Best ISPs of 2026, Kinetic’s ‘Most Transparent Pricing’

September 16, 2026

Walbridge announces the formation of L5 Mission Critical to Support Increased Demand in Data Center Operations

September 16, 2026

Verifone Data: “Loyalty Stacking” Hits a New High as Gas Prices Peak

September 16, 2026

YILPORT Gebze Terminal Increases Yard Performance by 21% with Kaleris RTG Optimization

September 16, 2026

A True Driver’s Ferrari Enzo to Lead Broad Arrow’s Second Annual Las Vegas Auction

September 16, 2026
Facebook X (Twitter) Instagram
Finance Pro
Facebook X (Twitter) Instagram
Daily Guardian
Subscribe
  • Home
  • News
  • Politics
  • Business
  • Entertainment
  • Lifestyle
  • Health
  • Sports
  • Technology
  • Climate
  • Auto
  • Travel
  • Web Stories
Daily Guardian
Home » New Brunswick’s nuclear power plant expected to be off-line for weeks, official says
News

New Brunswick’s nuclear power plant expected to be off-line for weeks, official says

By News RoomSeptember 16, 20262 Mins Read
New Brunswick’s nuclear power plant expected to be off-line for weeks, official says
Share
Facebook Twitter LinkedIn Pinterest Email

By Eli Ridder

The Canadian Press

Posted September 16, 2026 6:06 pm

1 min read

A representative for New Brunswick’s nuclear power plant says it’s expected to remain off-line for a few weeks as they make a repair.

The station’s community manager Kathleen Duguay says plant workers have located a heavy-water leak from a broken pipe known as an instrumentation line.

She says workers weren’t able to access the broken line until the plant cooled down — and even then they still needed to use special equipment such as a scissor lift.

Get breaking Canada news delivered to your inbox as it happens so you won't miss a trending story.

Get breaking National news

Get breaking Canada news delivered to your inbox as it happens so you won’t miss a trending story.

With the problem identified, Duguay says crews are working out a plan to fix the line at the Point Lepreau Nuclear Generating Station.

The station was first taken off-line Sept. 11, the third shutdown this year.

NB Power, the public utility that operates the plant, says there is no risk to the public, employees or the environment.


While the 43-year-old plant’s nuclear core was largely rebuilt some 14 years ago, many of its auxiliary components such as the instrumentation lines have been in place since it opened in the 1980s.

Earlier this year, the nuclear power facility was off-line from April to August for scheduled system checks and other maintenance.

Then, it was off-line for several days in early September for turbine system repairs.

&copy 2026 The Canadian Press

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email

Keep Reading

Micro-shelter village being built in Scarborough

B.C. skyrunner’s family believe she fell to her death on Italy’s Matterhorn

Redblacks, Stampeders are both in need of victory

CPP Investments and Brookfield just launched a $50B Maple Fund. What is it?

First batch of B.C. law students takes course over bar exam as Ontario mulls switch

Cost of Alberta separation could be up to $170B: report

Élections Québec ordered to mail bilingual voter information by Quebec judge

8 charged after $2.8M in illicit cannabis seized on Tyendinaga Mohawk Territory

No injuries reported after small plane’s emergency landing east of Edmonton: RCMP

Editors Picks

Walbridge announces the formation of L5 Mission Critical to Support Increased Demand in Data Center Operations

September 16, 2026

Verifone Data: “Loyalty Stacking” Hits a New High as Gas Prices Peak

September 16, 2026

YILPORT Gebze Terminal Increases Yard Performance by 21% with Kaleris RTG Optimization

September 16, 2026

A True Driver’s Ferrari Enzo to Lead Broad Arrow’s Second Annual Las Vegas Auction

September 16, 2026

Latest News

AI Moves From Promising to Business-Critical for Real Estate Brokerages, Survey Finds

September 16, 2026

New From Panasonic, Ultra-Wide Compact LUMIX S 20mm Full-Frame Lens; Learn More Info at B&H Photo

September 16, 2026

GotPouches Completes Transition to Fully U.S.-Based Operations in Tennessee

September 16, 2026
Facebook X (Twitter) Pinterest TikTok Instagram
© 2026 Daily Guardian Canada. All Rights Reserved.
  • Privacy Policy
  • Terms
  • Advertise
  • Contact

Type above and press Enter to search. Press Esc to cancel.

Go to mobile version