Close Menu
Daily Guardian
  • Home
  • News
  • Politics
  • Business
  • Entertainment
  • Lifestyle
  • Health
  • Sports
  • Technology
  • Climate
  • Auto
  • Travel
  • Web Stories
What's On

Black Rock Coffee Bar Celebrates Surpassing 200 Locations with Opening in Denver

August 5, 2026

The Soccer League That Never Stops: LegaBot, the World’s First Livestreamed Autonomous AI Football Universe

August 5, 2026

Tariffs led to price changes for majority of Canadian businesses: KPMG poll

August 5, 2026

Apple’s selling refurbished MacBook Neos with a $100 discount

August 5, 2026

Minuteman Press Franchise Owner Ken Holloway Achieves President’s Club for Two South Carolina Centers

August 5, 2026
Facebook X (Twitter) Instagram
Finance Pro
Facebook X (Twitter) Instagram
Daily Guardian
Subscribe
  • Home
  • News
  • Politics
  • Business
  • Entertainment
  • Lifestyle
  • Health
  • Sports
  • Technology
  • Climate
  • Auto
  • Travel
  • Web Stories
Daily Guardian
Home » Most U.S. Contractors Still Struggle to Catch Cost Overruns in Time, New Study Finds
Press Release

Most U.S. Contractors Still Struggle to Catch Cost Overruns in Time, New Study Finds

By News RoomAugust 5, 20264 Mins Read
Most U.S. Contractors Still Struggle to Catch Cost Overruns in Time, New Study Finds
Share
Facebook Twitter LinkedIn Pinterest Email

Toronto, Aug. 05, 2026 (GLOBE NEWSWIRE) — As contractors continue investing in software, AI and integrated project controls, many are still falling short when it comes to identifying cost overruns before they escalate, according to a new study by CMiC, a leading AI-powered construction ERP, and Dodge Construction Network (DCN). The research found that while most contractors keep cost overruns relatively modest, fewer than half (41 per cent) can identify potential overruns while they are still manageable on at least half of their projects, leaving many firms with limited time to take corrective action.

The study also found that contractors are least satisfied with their schedule management and risk management technology, while only 6 per cent report having a fully connected project controls environment.

The online survey was conducted between May 15 and June 1, 2026, among U.S. professionals working in general contracting, construction management, heavy civil and specialty contractor firms involved in non-residential construction. Respondents were selected from the DCN Contractor Panel and Dodge Database to examine how the industry manages project controls, the technologies firms rely on and where operational gaps remain.

“We have seen the impact of connected project controls firsthand in our own customer base”, said Steve Cangiano, Chief Product Officer – CMiC. “Enterprises using CMiC’s project controls consistently report better visibility and fewer surprises on their projects, which is no coincidence given only 6 per cent of contractors overall have a fully connected environment. It confirms why we continue to invest in this connected foundation as a core part of our product roadmap.”

Key highlights from the survey:

  • Cost overruns remain manageable but often go undetected until it’s too late. Most contractors keep overruns within 3–5 per cent, but early warning remains a challenge.
  • Seven in ten contractors deliver at least half of their projects on or ahead of schedule, with specialty contractors outperforming general contractors.
  • Project controls are a priority, but implementation is inconsistent. While 70 per cent view project controls as critical, few firms have fully integrated processes and data across their organizations.
  • Technology investment is focused on improving data access. Over the past three years, software upgrades have been the leading investment in project controls, with better data access cited as the biggest benefit.AI adoption is still in its early stages. Only 19 per cent consider AI a high priority, with lack of expertise, integration challenges, and uncertain ROI slowing adoption.
  • Ease of implementation matters most. Contractors prioritize ease of use and system integration over cost or AI capabilities when selecting project controls-focused technology.
  • Satisfaction varies by function. Contractors are most satisfied with document and scope management features, while risk and schedule management continue to lag.
  • Schedule data reveals significant room for improvement: Only 35 per cent of contractors say their scheduling data is current and reliable.

The findings suggest the industry’s biggest challenge is no longer collecting project data, but turning it into faster, more informed decisions. Many contractors still rely on disconnected systems and manual processes, and only 22 per cent said they could generate decision-ready information within hours when cost or schedule issues arise. Most need a day or two days, reducing the opportunity to address problems before they escalate.

As contractors continue investing in integrated platforms and AI-enabled tools, the study suggests the greatest opportunity lies in connecting project and financial data so teams can respond to risks sooner and make decisions with greater confidence.

Access the Full Report
Download the 2026 Project Controls Study at cmicglobal.com.
About CMiC
As an industry pioneer, CMiC delivers complete and unified Financials and Project Management software solutions for construction and capital projects firms. CMiC’s powerful software transforms how firms optimize productivity, minimize risk and drive growth by planning and managing all financials, projects, resources, and content assets—from a Single Database Platform™. With customers throughout North America and overseas, CMiC serves one-quarter of ENR’s Top 400 Contractors and hundreds of small and mid-sized construction firms, from general and specialty contractors to heavy/highway and project owners. Over $100 billion in construction revenue is handled by CMiC annually.

For media inquiries, please contact:
Tameika Thomas
CMiC
[email protected]

  • CMiC and Dodge Construction Network survey

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email

Keep Reading

Black Rock Coffee Bar Celebrates Surpassing 200 Locations with Opening in Denver

The Soccer League That Never Stops: LegaBot, the World’s First Livestreamed Autonomous AI Football Universe

Minuteman Press Franchise Owner Ken Holloway Achieves President’s Club for Two South Carolina Centers

Gordie Howe International Bridge Opens to Pedestrians and Cyclists, Completing First International Trail Crossing on the Trans Canada Trail

ValueSelling Associates CEO Julie Thomas to Lead Sales Enablement Collective Webinar on Turning Top-Performer Behaviors Into a Team-Wide Standard

Trailblazing HBCU Institutions, Leaders and Advocates Recognized by UNCF at Annual Awards Ceremony During UNITE 2026

Rebecca Jackson LLC Expands Beyond Social Media with a Media and Education Business Built Around Faith, Family, and Entrepreneurship

Bitget Wallet X Launches Solver Program for Intent-Based Trading

New Research: The Confidence Gap Between CISOs and Their Boards Is Real, and It’s Measurable

Editors Picks

The Soccer League That Never Stops: LegaBot, the World’s First Livestreamed Autonomous AI Football Universe

August 5, 2026

Tariffs led to price changes for majority of Canadian businesses: KPMG poll

August 5, 2026

Apple’s selling refurbished MacBook Neos with a $100 discount

August 5, 2026

Minuteman Press Franchise Owner Ken Holloway Achieves President’s Club for Two South Carolina Centers

August 5, 2026

Latest News

Gordie Howe International Bridge Opens to Pedestrians and Cyclists, Completing First International Trail Crossing on the Trans Canada Trail

August 5, 2026

ValueSelling Associates CEO Julie Thomas to Lead Sales Enablement Collective Webinar on Turning Top-Performer Behaviors Into a Team-Wide Standard

August 5, 2026

Trailblazing HBCU Institutions, Leaders and Advocates Recognized by UNCF at Annual Awards Ceremony During UNITE 2026

August 5, 2026
Facebook X (Twitter) Pinterest TikTok Instagram
© 2026 Daily Guardian Canada. All Rights Reserved.
  • Privacy Policy
  • Terms
  • Advertise
  • Contact

Type above and press Enter to search. Press Esc to cancel.

Go to mobile version