Close Menu
Daily Guardian
  • Home
  • News
  • Politics
  • Business
  • Entertainment
  • Lifestyle
  • Health
  • Sports
  • Technology
  • Climate
  • Auto
  • Travel
  • Web Stories
What's On

Yarbo says it will remove the intentional backdoor from its robot lawn mower

May 11, 2026

Prairies Premier League soccer kicks off in Saskatoon

May 11, 2026

Majority of Canadians say energy policy should focus on economic growth: poll

May 11, 2026

OpenAI just released its answer to Claude Mythos

May 11, 2026

BIGC Acquires Blip and K-POP RADAR, Launching Industry’s First Data-Driven “Enter OS” Powered by 1.3 Billion Fan Data Points

May 11, 2026
Facebook X (Twitter) Instagram
Finance Pro
Facebook X (Twitter) Instagram
Daily Guardian
Subscribe
  • Home
  • News
  • Politics
  • Business
  • Entertainment
  • Lifestyle
  • Health
  • Sports
  • Technology
  • Climate
  • Auto
  • Travel
  • Web Stories
Daily Guardian
Home » Michigan DOT Selects Acrow Detour Solution for US-131 Bridge Replacement Project
Press Release

Michigan DOT Selects Acrow Detour Solution for US-131 Bridge Replacement Project

By News RoomAugust 21, 20254 Mins Read
Michigan DOT Selects Acrow Detour Solution for US-131 Bridge Replacement Project
Share
Facebook Twitter LinkedIn Pinterest Email

PARSIPPANY, N.J., Aug. 21, 2025 (GLOBE NEWSWIRE) — Acrow, a leading international bridge engineering and supply company, announced today it has designed and supplied a modular steel bridge to carry traffic during major highway construction in Kalamazoo, Michigan. Acrow’s structure was installed on US-131 to minimize inconvenience during a project to replace two aging bridges on the heavily traveled route.

As a key north-south corridor throughout the State of Michigan, US-131 sees significant commercial and non-commercial traffic near Kalamazoo, including many vehicles accessing the nearby Interstate 94 interchange. When two US-131 bridges over KL Avenue and Amtrak rail lines had exceeded their lifespan and usability, replacement, rather than additional repair, was considered the best option. An alternate route for the traffic that ran below the bridges was available, however, a solution to maintaining the full capacity of US-131 for the duration of the construction was needed.

While a detour bridge was considered early in the planning, one of the major concerns was the extremely limited space to assemble and install the structure. Additionally, it was critical that any interruptions to busy high-speed train schedules be avoided as well as any damage to the rail infrastructure. MDOT selected a proposal submitted by Acrow during the design phase based on past performance, technical approach and quality certifications. Following extensive collaboration between all stakeholders, MDOT then included Acrow’s temporary bridge with support towers as a baseline condition when the project was put out to bid.

The Acrow 700XS® bridge is 350 feet (106.68m) long in spans of 200 feet (60.96m) and 150 feet (45.72m), and it has a two-lane width of 30 feet (9.15m) with an asphalt overlay deck surface. The bridge is supported by two Acrow 700XS® Towers, approximately 30 feet (9.15m) in height, which serve as intermediate piers. The structure was assembled in the median, with only 8 to 10 feet (2.44m to 3.05m) between the bridge and the live traffic on each side, and the bridge was installed with a full cantilever launch. Northbound traffic was shifted to the detour structure in mid-March to allow for reconstruction of the first bridge. In mid-July, northbound traffic moved onto the newly completed bridge and southbound traffic was rerouted to the detour structure. Acrow’s temporary detour bridge is expected to remain in service until late October 2025, when construction of both new bridges is scheduled to be completed.

“Acrow’s rapidly installed bridge was the perfect solution for this project, owing to the extremely limited build area and short timeframe required,” said Abbey Smith, Business Development Manager, Great Lakes Region. “With many years of experience designing detour bridges for highway upgrades and near active rail lines, Acrow has a thorough understanding of the unique challenges of these projects.”

“As projects to repair or replace aging infrastructure increase, Acrow’s versatile detour bridges are an ideal way to provide reliable, cost-effective access during priority projects,” said Eugene Sobecki, Director National Sales & Military Business Development. “In addition to enhanced work zone safety, detour bridges keep residents safe by enabling construction to continue without re-routing traffic through local community streets. They also mitigate impacts to the local economy and help keep projects on or ahead of schedule.”

About Acrow
Acrow has been serving the transportation and construction industries for more than 70 years with a wide range of modular steel bridging solutions for permanent, temporary, military and emergency use. Acrow’s extensive international presence includes leadership in the development and implementation of bridge infrastructure projects in over 150 countries across Africa, Asia, the Americas, Europe and the Middle East. For more information, please visit www.acrow.com.

Media contact:
Tracy Van Buskirk
Marketcom PR
Main: (212) 537-5177, ext. 8; Mobile: (203) 246-6165
[email protected]

A photo accompanying this announcement is available at https://www.globenewswire.com/NewsRoom/AttachmentNg/1c2f2257-11d3-48af-9d21-5a5bb07b5a5a

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email

Keep Reading

BIGC Acquires Blip and K-POP RADAR, Launching Industry’s First Data-Driven “Enter OS” Powered by 1.3 Billion Fan Data Points

Money Skills Launches AI-Powered Quantitative Trading Environment, Focusing on Structured Market Analysis and Disciplined Decision-Making

South Korea Autonomous Vehicles Market Forecast and Company Analysis Report 2026-2034 Featuring Hyundai, General Motor, Renault, and KG Mobility

CPTx appoints Edward Rebar as Chief Scientific Officer

Nomagic and Brack.Alltron Expand Partnership to Include Vision-Language-Action Systems in Production

Traction Uranium Announces Survey Specifications for High-Resolution Airborne Radiometric and Magnetic Survey at the Aurora Uranium Project, Saskatchewan

Osisko Development Reports First Quarter 2026 Results

Drilling Commences on the Rip Copper-Molybdenum Project

Enterprise AI Is Stalling: 46% of Initiatives Fall Short Despite Rising Investment

Editors Picks

Prairies Premier League soccer kicks off in Saskatoon

May 11, 2026

Majority of Canadians say energy policy should focus on economic growth: poll

May 11, 2026

OpenAI just released its answer to Claude Mythos

May 11, 2026

BIGC Acquires Blip and K-POP RADAR, Launching Industry’s First Data-Driven “Enter OS” Powered by 1.3 Billion Fan Data Points

May 11, 2026

Latest News

Vancouver’s Oakridge Park mall sets May 28 as opening date

May 11, 2026

Money Skills Launches AI-Powered Quantitative Trading Environment, Focusing on Structured Market Analysis and Disciplined Decision-Making

May 11, 2026

South Korea Autonomous Vehicles Market Forecast and Company Analysis Report 2026-2034 Featuring Hyundai, General Motor, Renault, and KG Mobility

May 11, 2026
Facebook X (Twitter) Pinterest TikTok Instagram
© 2026 Daily Guardian Canada. All Rights Reserved.
  • Privacy Policy
  • Terms
  • Advertise
  • Contact

Type above and press Enter to search. Press Esc to cancel.

Go to mobile version