Close Menu
Daily Guardian
  • Home
  • News
  • Politics
  • Business
  • Entertainment
  • Lifestyle
  • Health
  • Sports
  • Technology
  • Climate
  • Auto
  • Travel
  • Web Stories
What's On

Edmonton under emergency alert as rainfall pushes stormwater system to capacity

June 22, 2026

Cosmos Health Builds Contract Manufacturing Orderbook to Over 25 Million Units; Division Positioned to Generate Over $10 Million in Recurring Annual Profit

June 22, 2026

Patreon CEO Jack Conte on supporting artists in the AI slop era

June 22, 2026

Paychex Named One of America’s Most Trustworthy Companies by Newsweek

June 22, 2026

Heilind Electronics Now Stocking Hirose DF22 Series Compact Branch Connectors for High-Current Power Distribution Applications

June 22, 2026
Facebook X (Twitter) Instagram
Finance Pro
Facebook X (Twitter) Instagram
Daily Guardian
Subscribe
  • Home
  • News
  • Politics
  • Business
  • Entertainment
  • Lifestyle
  • Health
  • Sports
  • Technology
  • Climate
  • Auto
  • Travel
  • Web Stories
Daily Guardian
Home » Metrolinx writes off $500M in signalling upgrades that are no longer useful
News

Metrolinx writes off $500M in signalling upgrades that are no longer useful

By News RoomJune 22, 20263 Mins Read
Metrolinx writes off 0M in signalling upgrades that are no longer useful
Share
Facebook Twitter LinkedIn Pinterest Email

Ontario’s transit agency is writing off more than half a billion dollars it spent upgrading signalling infrastructure on the tracks around its main station in downtown Toronto after it overhauled its vision for how to expand GO train service.

As part of its annual report, Metrolinx said it would write off $504 million spent on signalling work for the Union Rail Corridor section of its track, which began in 2013.

The work had originally been designed to modernize and upgrade the key downtown Toronto portion of its commuter train network but, as its plans to expand train service evolved, the half-a-billion investment became redundant.

“The project was paused in 2023 when the risk of incompatibility was identified and while advanced layouts for the tracks were still being developed,” the Metrolinx annual report explained.

“Therefore, there was material uncertainty in prior years as to which specific assets would no longer have permanent service potential as this was dependent on the advancement of the GO Expansion track design.”

By 2026, the report said Metrolinx had finally gotten a better understanding of how it would expand the GO network and realized that large portions of the signal work it had done previously were effectively of no use.

Get daily Canada news delivered to your inbox so you'll never miss the day's top stories.

Get daily National news

Get daily Canada news delivered to your inbox so you’ll never miss the day’s top stories.

The annual report said a “usable portion of the work” that had already been finished would be incorporated into the new expansion plans.

“The rapid progress of GO Expansion has fundamentally changed how Metrolinx plans to operate the GO Network going forward,” a spokesperson wrote in a statement.

“As planning advanced for the broader GO Expansion plans, it became clear that the approach to modernizing the legacy signalling system would not support the signalling requirements for the higher-frequency, two-way, all-day service in the most important corridors of the GO Network.”

The agency’s promise of two-way, all-day GO train service across Toronto and the surrounding area has been in flux for years.


In January 2024, Metrolinx announced it had accepted a proposal from ONXpress — made up of German train operator Deutsche Bahn and Canadian Aecon Concessions — to plan and run its rail system.

ONXpress was set to begin operating and maintaining GO train systems beginning in January 2025. The group was also tasked with offering better, faster train service as Ontario converts the GO network to run a more efficient, electric fleet.

The Ford government said the agreement with ONXpress — which was unveiled in 2022 — would “modernize and transform” the rail network.

Just months after they were supposed to have taken over GO operations, however, Deutsche Bahn and Canadian Aecon Concessions parted ways with Metrolinx.

The contract was supposed to run for 23 years.

Current Metrolinx CEO Michael Lindsay was appointed last year and has indicated a major shift in how the agency runs its work away from consultants and toward full-time staff.

He has also overseen increasingly common closures across the network, construction work he says is key to delivering the new, more regular GO train service.

The $500-million writeoff represents roughly one per cent of Metrolinx’s capital asset balance.

&copy 2026 Global News, a division of Corus Entertainment Inc.

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email

Keep Reading

Edmonton under emergency alert as rainfall pushes stormwater system to capacity

Canada commits to purchase Arctic radar system components from Australia

Southern Alberta family dog recovering after being shot

Civilians behind international police probe into Russian cybercriminals

Feds’ AI bill good ‘first step’ but safety advocates say more work needed

Firefighters battling wildfire near Lytton, B.C., helped by cooler temperatures

Alberta premier criticizes Calgary Stampede noise bylaw: ‘Fun police have struck’

More than 100mm of rain falls on Montreal: floods homes, causes outages

The hard-fought race to build Canada’s next submarine fleet

Editors Picks

Cosmos Health Builds Contract Manufacturing Orderbook to Over 25 Million Units; Division Positioned to Generate Over $10 Million in Recurring Annual Profit

June 22, 2026

Patreon CEO Jack Conte on supporting artists in the AI slop era

June 22, 2026

Paychex Named One of America’s Most Trustworthy Companies by Newsweek

June 22, 2026

Heilind Electronics Now Stocking Hirose DF22 Series Compact Branch Connectors for High-Current Power Distribution Applications

June 22, 2026

Latest News

NTHU Researchers Develop World’s Brightest Single-Photon Source for Quantum Technologies

June 22, 2026

Dogfish Head & Rolling Stone Celebrate 250 Years of American Music with Exclusive Whiskey Collaboration

June 22, 2026

Errante Reinforces Its Commitment to Client Experience with the Launch of Errante Pulse

June 22, 2026
Facebook X (Twitter) Pinterest TikTok Instagram
© 2026 Daily Guardian Canada. All Rights Reserved.
  • Privacy Policy
  • Terms
  • Advertise
  • Contact

Type above and press Enter to search. Press Esc to cancel.

Go to mobile version