Close Menu
Daily Guardian
  • Home
  • News
  • Politics
  • Business
  • Entertainment
  • Lifestyle
  • Health
  • Sports
  • Technology
  • Climate
  • Auto
  • Travel
  • Web Stories
What's On

If that tax refund feels like a lifeline, you’re not alone. How to use it

April 3, 2026

Toobit’s $600,000 Easter Egg-venture Brings Interactive Quests to Global Traders

April 3, 2026

MEXC Announces USD1 Launchpool Event with 1,500,000 WLFI Prize Pool

April 3, 2026

Paydibs Strengthens Digital Commerce Infrastructure for Businesses

April 3, 2026

MEXC Integrates USD1 into Full-Spectrum Infrastructure for Global Users

April 3, 2026
Facebook X (Twitter) Instagram
Finance Pro
Facebook X (Twitter) Instagram
Daily Guardian
Subscribe
  • Home
  • News
  • Politics
  • Business
  • Entertainment
  • Lifestyle
  • Health
  • Sports
  • Technology
  • Climate
  • Auto
  • Travel
  • Web Stories
Daily Guardian
Home » First Helium Spuds 7-30 Undeveloped Light Oil Well at Worsley
Press Release

First Helium Spuds 7-30 Undeveloped Light Oil Well at Worsley

By News RoomJanuary 21, 20255 Mins Read
First Helium Spuds 7-30 Undeveloped Light Oil Well at Worsley
Share
Facebook Twitter LinkedIn Pinterest Email

CALGARY, Alberta, Jan. 21, 2025 (GLOBE NEWSWIRE) — First Helium Inc. (“First Helium” or the “Company”) (TSXV: HELI) (OTCQB: FHELF) (FRA: 2MC) today announced that it has begun drilling its proven undeveloped (“PUD”) 7-30 oil location at its Worsley Property in Northern Alberta1,2. Following drilling of the 7-30 vertical well, the contractor’s drilling rig will move directly to the 7-15 location to begin drilling in early February, barring any unforeseen delays. The Company will continue to provide regular updates on ongoing field activities.

“We are excited to be drilling again – starting with our 7-30 light oil development well which spudded this past weekend. We will follow up by drilling our high impact Leduc anomaly, 7-15, which on seismic is approximately 5X the areal extent of our successful 1-30 light oil pool discovery. Favorable results from these two wells will further de-risk our Leduc Play, where we have identified 10 additional primary locations on proprietary 3D seismic, and potential for further southeast extension across our 100% owned lands,” said Ed Bereznicki, President & CEO of First Helium. “With success, the combined oil potential from these two operations would provide immediate cash flow and meaningful near-term value for our shareholders,” added Mr. Bereznicki.

The 7-15 vertical well location (see Figure 1) has been prepared for drilling. The proximity of the two locations, approximately 6 kilometers apart, will enable efficient rig transfer and minimize mobilization costs. Subject to results, necessary preparations are being made to complete, equip and tie-in the two wells prior to spring break up in Alberta (a period from mid/late March through May when Provincial highway restrictions limit heavy equipment movement), further setting the stage for systematic development across the Company’s extensive land base.

Figure 1:
Worsley Project Inventory

Notes:
  (1) Prepared by Sproule Associates Limited (“Sproule”), independent qualified reserves evaluator, in accordance with COGE Handbook.
  (2) Assigned 196,700 Barrels of Gross Proved plus Probable Undeveloped reserves, per Sproule, Evaluation of the P&NG Reserves of First Helium Inc. in the Beaton Area of Alberta (as of March 31, 2023). See First Helium’s SEDAR+ profile at www.sedarplus.ca.


Option Grant

Today the Company granted 8,000,000 incentive stock options to certain Directors, Officers and key Consultants of the Company. The Options are exercisable at a price of $0.09 and valid until January 21, 2030.

ABOUT FIRST HELIUM

Led by a core Senior Executive Team with diverse and extensive backgrounds in Oil & Gas Exploration and Operations, Mining, Finance, and Capital Markets, First Helium seeks to be one of the leading independent providers of helium gas in North America.

First Helium holds over 53,000 acres along the highly prospective Worsley Trend in Northern Alberta which has been the core of its exploration and development drilling activities to date.

Building on its successful 15-25 helium discovery well, and 1-30 and 4-29 oil wells at the Worsley project, the Company has identified numerous follow-up drill locations and acquired an expansive infrastructure system to facilitate future exploration and development across its Worsley land base. Cash flow from its successful oil wells at Worsley has helped support First Helium’s ongoing exploration and development growth strategy. Further potential oil drilling locations have also been identified on the Company’s Worsley land base.

For more information about the Company, please visit www.firsthelium.com.

ON BEHALF OF THE BOARD OF DIRECTORS

Edward J. Bereznicki
President, CEO and Director

CONTACT INFORMATION

First Helium Inc.
Investor Relations
Email: [email protected]
Phone: 1-833-HELIUM1 (1-833-435-4861)

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

FORWARD LOOKING STATEMENTS

This press release contains forward looking statements within the meaning of applicable securities laws. The use of any of the words “anticipate”, “plan”, “continue”, “expect”, “estimate”, “objective”, “may”, “will”, “project”, “should”, “predict”, “potential” and similar expressions are intended to identify forward looking statements. In particular, this press release contains forward looking statements concerning the completion of future planned activities. Although the Company believes that the expectations and assumptions on which the forward-looking statements are based are reasonable, undue reliance should not be placed on the forward-looking statements because the Company cannot give any assurance that they will prove correct. Since forward looking statements address future events and conditions, they involve inherent assumptions, risks and uncertainties. Actual results could differ materially from those currently anticipated due to a number of assumptions, factors and risks. These assumptions and risks include, but are not limited to, assumptions and risks associated with the state of the equity financing markets and regulatory approval.

Management has provided the above summary of risks and assumptions related to forward looking statements in this press release in order to provide readers with a more comprehensive perspective on the Company’s future operations. The Company’s actual results, performance or achievement could differ materially from those expressed in, or implied by, these forward-looking statements and, accordingly, no assurance can be given that any of the events anticipated by the forward-looking statements will transpire or occur, or if any of them do so, what benefits the Company will derive from them. These forward-looking statements are made as of the date of this press release, and, other than as required by applicable securities laws, the Company disclaims any intent or obligation to update publicly any forward-looking statements, whether as a result of new information, future events or results or otherwise.

SOURCE: First Helium Inc.

A photo accompanying this announcement is available at https://www.globenewswire.com/NewsRoom/AttachmentNg/ea92f055-5a98-4262-8475-38fb286df847

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email

Keep Reading

Toobit’s $600,000 Easter Egg-venture Brings Interactive Quests to Global Traders

MEXC Announces USD1 Launchpool Event with 1,500,000 WLFI Prize Pool

Paydibs Strengthens Digital Commerce Infrastructure for Businesses

MEXC Integrates USD1 into Full-Spectrum Infrastructure for Global Users

Toobit Continues High-Yield Offerings with 30% APR on USDC

Enjoy a Fashion Spectacle Inspired by “One Car Two Vibes” at the Launch of the C5 SHS-H

Nominations now open for 2026 Landmarks Illinois Richard H. Driehaus Foundation Preservation Awards

GLP-1 is rewriting retail demand: Four purchase rhythms retailers are missing

Inc. Names Next Point LLC to Its 2026 List of the Fastest-Growing Private Companies in the Northeast

Editors Picks

Toobit’s $600,000 Easter Egg-venture Brings Interactive Quests to Global Traders

April 3, 2026

MEXC Announces USD1 Launchpool Event with 1,500,000 WLFI Prize Pool

April 3, 2026

Paydibs Strengthens Digital Commerce Infrastructure for Businesses

April 3, 2026

MEXC Integrates USD1 into Full-Spectrum Infrastructure for Global Users

April 3, 2026

Latest News

Toobit Continues High-Yield Offerings with 30% APR on USDC

April 3, 2026

Enjoy a Fashion Spectacle Inspired by “One Car Two Vibes” at the Launch of the C5 SHS-H

April 3, 2026

Problems plague BC Ferries ahead of Easter long weekend

April 3, 2026
Facebook X (Twitter) Pinterest TikTok Instagram
© 2026 Daily Guardian Canada. All Rights Reserved.
  • Privacy Policy
  • Terms
  • Advertise
  • Contact

Type above and press Enter to search. Press Esc to cancel.

Go to mobile version