Close Menu
Daily Guardian
  • Home
  • News
  • Politics
  • Business
  • Entertainment
  • Lifestyle
  • Health
  • Sports
  • Technology
  • Climate
  • Auto
  • Travel
  • Web Stories
What's On

Black Montreal police employees told management some are worried about going to work

June 19, 2026

Rutland’s ‘Blue Shirts’ return to support businesses, community

June 19, 2026

Kelowna councilllor Ron Cannan launches mayoral campaign, promises focus on public safety

June 18, 2026

Weeknight concerts during Calgary Stampede must end at midnight, city memo says

June 18, 2026

Embracing the “Travel + Sports” Philosophy, JETOUR Supports Global Football Development

June 18, 2026
Facebook X (Twitter) Instagram
Finance Pro
Facebook X (Twitter) Instagram
Daily Guardian
Subscribe
  • Home
  • News
  • Politics
  • Business
  • Entertainment
  • Lifestyle
  • Health
  • Sports
  • Technology
  • Climate
  • Auto
  • Travel
  • Web Stories
Daily Guardian
Home » Drilling Resumes on Globex’s Berrigan Zinc, Gold, Silver Royalty Property NW of Chibougamau, Quebec
Press Release

Drilling Resumes on Globex’s Berrigan Zinc, Gold, Silver Royalty Property NW of Chibougamau, Quebec

By News RoomApril 1, 20264 Mins Read
Drilling Resumes on Globex’s Berrigan Zinc, Gold, Silver Royalty Property NW of Chibougamau, Quebec
Share
Facebook Twitter LinkedIn Pinterest Email

TORONTO, April 01, 2026 (GLOBE NEWSWIRE) — GLOBEX MINING ENTERPRISES INC. (GMX – Toronto Stock Exchange, G1MN – Frankfurt, Stuttgart, Berlin, Munich, Tradegate, Lang & Schwarz, LS Exchange, TTMzero, Düsseldorf and Quotrix Düsseldorf Stock Exchanges and GLBXF – OTCQX International in the US) is pleased to report to shareholders that TomaGold Corporation (LOT-TSXV, TOGOF-OTCPK) has started a drill program to extend 5 recent drill holes in order to intersect a newly discovered zinc/gold/silver zone intersected beneath the previously known Berrigan mineralized zone.

The Berrigan property is a part of a large land package under option by TomaGold from Chibougamau Independent Mines Inc. on which Globex retains a 2% Gross Metal Royalty (see details in a Globex press release dated August 14, 2023).

The five drill hole extensions are planned to intersect the horizon where previous drill hole TOM-25-015 intersected 5.08% Zn Eq (1.19 g/t Au Eq) over 98.50 m, including 23.20% Zn Eq (5.44 g/t Au Eq) over 4.90 m.

Drilling from the previous phase of TomaGold drilling returned significant mineralized intersections as listed below.

Summary of Phase 1 drilling results at the Berrigan Mine project

Hole ID From (m) To (m) Length (m) ZnEq (%) AuEq (g/t) Au (g/t) Ag (g/t) Cu (%) Zn (%)
TOM-25-009 156.70 204.75 48.05 5.82 1.36 1.12 7.55 0.04 1.40
including 156.70 159.60 2.90 33.97 7.96 6.76 40.24 0.19 7.57
including 163.95 169.00 5.05 3.42 0.80 0.41 11.35 0.03 1.43
including 181.70 182.90 1.20 12.25 2.87 2.36 19.50 0.03 2.89
including 189.20 194.60 5.40 19.07 4.47 3.75 16.35 0.08 4.81
including 196.00 198.60 2.60 2.06 0.49 0.43 5.28 0.06 0.11
including 204.00 204.70 0.70 37.71 8.85 8.71 9.20 0.05 6.01
  230.35 236.80 6.45 1.23 0.29 0.14 1.23 0.03 0.67
including 235.70 236.80 1.10 5.00 1.17 0.72 2.80 0.04 2.27
  244.50 259.70 15.20 4.87 1.14 0.59 7.22 0.04 2.40
including 254.60 257.15 2.55 22.75 5.29 2.24 32.07 0.15 13.42
TOM-25-010 108.00 111.00 3.00 2.18 0.51 0.51 1.53 0.02 0.23
  120.65 125.00 4.35 8.03 1.87 0.95 9.11 0.05 4.26
including 121.95 125.00 3.05 8.30 1.93 0.84 10.56 0.06 4.86
  130.70 179.00 48.30 2.38 0.56 0.30 4.11 0.04 1.06
including 135.75 142.00 6.25 11.43 2.66 1.63 16.13 0.09 4.79
including 144.80 149.00 4.20 2.01 0.47 0.12 4.68 0.04 1.31
including 158.30 159.35 1.05 3.73 0.87 0.16 5.93 0.10 2.73
including 175.50 177.70 2.20 4.11 0.96 0.79 3.57 0.04 1.04
TOM-25-011 291.00 309.50 18.50 1.81 0.42 0.31 1.97 0.01 0.60
including 295.90 296.40 0.50 4.83 1.12 0.42 5.40 0.04 3.10
including 307.50 309.50 2.00 16.12 3.77 2.63 9.47 0.05 4.30
  341.00 342.00 1.00 2.83 0.65 0.07 1.00 0.02 2.59
  344.10 345.00 0.90 4.69 1.09 0.39 3.50 0.04 3.16
TOM-25-012 283.85 285.00 1.15 5.51 1.31 0.71 4.10 0.88 0.02
TOM-25-013 No significant value
TOM-25-014 185.00 187.10 2.10 24.85 5.83 4.94 56.44 0.05 4.55
  238.70 239.85 1.15 20.86 4.86 2.63 22.20 0.16 10.40
  251.20 252.60 1.40 36.34 8.51 7.44 37.30 0.06 8.04
  405.30 406.70 1.40 13.68 3.17 1.13 13.15 0.07 9.25
  423.30 426.30 3.00 2.15 0.50 0.07 5.45 0.05 1.57
  451.50 457.50 6.00 1.22 0.28 0.08 3.45 0.01 0.79
TOM-25-015 132.55 141.00 8.45 3.73 0.87 0.51 5.51 0.03 1.66
  155.70 157.70 2.00 28.08 6.56 4.66 26.90 0.07 10.29
  182.10 202.20 20.10 2.20 0.51 0.36 3.20 0.03 0.77
  451.20 549.70 98.50 5.08 1.19 0.82 3.21 0.04 1.98
including 452.20 457.10 4.90 23.20 5.44 4.69 18.80 0.29 4.79
and including 500.35 549.70 49.35 6.46 1.51 0.90 3.48 0.03 3.13
including 521.00 535.60 14.60 9.07 2.11 1.34 5.91 0.04 4.12
including 537.85 541.10 3.25 9.00 2.09 0.88 3.85 0.05 5.82
including 542.00 548.20 6.20 13.39 3.12 1.63 5.26 0.05 7.43


Notes:
(Source TomaGold Press Release: TomaGold Starts Drilling at Berrigan Mine, March31, 2026)

  • The reported widths represent core lengths. True width is estimated to be approximately 80-85% of the core length, depending on the deviation angles.
  • ZnEq and AuEq are calculated using the Company’s standard parameters.
  • AuEq calculation was based on US$4,150/oz Au, $51.34/oz Ag, US$5.023/lb Cu and $1.392/lb Zn. AuEq = Au g/t + (Ag g/t × 0.01237) + (Cu ppm × 0.000083) + (Zn ppm × 0.000023),applying metallurgical recovery factors of 95% for zinc, 85% for gold and silver, and 90% for copper, based on a metallurgical report on Berrigan Mine zinc material prepared by Process Research Associates Ltd. in February 2002 and on recoveries from nearby deposits for gold, silver and copper.
  • ZnEq calculation was based on US$4,047/oz Au, $50.22/oz Ag, US$4.796/lb Cu and $1.390/lb Zn. ZnEq = Zn ppm + (Ag g/t × 527) + (Au g/t x 42466) + (Cu ppm × 3.45) / 10,000, applying metallurgical recovery factors of 95% for zinc, 85% for gold and silver, and 90% for copper, based on a metallurgical report on Berrigan Mine zinc material prepared by Process Research Associates Ltd. in February 2002 and on recoveries from nearby deposits for gold, silver and copper.

TomaGold has released two graphics which illustrate the drill target and proposed drill hole extensions.

TomaGold 1,500-metre Phase 2 drilling program aimed at testing the newly
discovered Berrigan Deep Zone

TomaGold 1,500-metre Phase 2 drilling program aimed at testing the
newly discovered Berrigan Deep Zone

TomaGold 1,500-metre Phase 2 drilling program aimed at testing the newly discovered Berrigan Deep Zone

TomaGold’s press release, TomaGold Starts Drilling at Berrigan Mine dated March 31, 2026, may be accessed by clicking here.

This press release was prepared by Jack Stoch, P. Geo., Executive Chairman and CEO of Globex Mining Enterprises Inc. in his capacity as a Qualified Person (Q.P.) under NI 43-101.

We Seek Safe Harbour.   Foreign Private Issuer 12g3 – 2(b)
  CUSIP Number 379900 50 9
LEI 529900XYUKGG3LF9PY95
For further information, contact:
Jack Stoch, P.Geo., Acc.Dir.
Executive Chairman & CEO
Globex Mining Enterprises Inc.
120 Carlton Street, Unit 219
Toronto, Ontario, Canada M5A 4K2

Tel.: 819.797.5242
Fax: 819.797.1470
[email protected]
www.globexmining.com

Forward-Looking Statements: Except for historical information, this news release may contain certain “forward-looking statements”.  These statements may involve a number of known and unknown risks and uncertainties and other factors that may cause the actual results, level of activity and performance to be materially different from the expectations and projections of Globex Mining Enterprises Inc. (“Globex”).  No assurance can be given that any events anticipated by the forward-looking information will transpire or occur, or if any of them do so, what benefits Globex will derive therefrom.  A more detailed discussion of the risks is available in the “Annual Information Form” filed by Globex on SEDARplus.ca.

Photos accompanying this announcement are available at:

https://www.globenewswire.com/NewsRoom/AttachmentNg/4e5897e3-b343-4c45-b0b4-e9082afd6ebc

https://www.globenewswire.com/NewsRoom/AttachmentNg/e3f771c1-f05e-4300-a7c0-bd528b9d33d3

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email

Keep Reading

Embracing the “Travel + Sports” Philosophy, JETOUR Supports Global Football Development

Crypto News: AlphaPepe Plans More CEX Reveals After Azbit as Ethereum Price Prediction Hits $4,000

Australian Retirees Look to Leverage Retirement Capital To Generate Reliable Monthly Income – TermPlus June 2026 Two-Year Fixed-Term Account Delivers 8.00%* Per Annum

QS 2027, new record for Politecnico di Milano: 87th in the world and first in Italy

Aurora Mobile and AI Storm Enter into Business Partnership to Advance AI-Powered Customer Operations in Japan

Hi*Ball Energy Arrives in the UK, Leading a New Wave of Clean Energy

Century 21 Canada grows 39% in Quebec

Rixos Opens Second Resort in Hurghada Amid Rising Polish Demand

Italpreziosi Celebrates Ducati’s 100th Anniversary with an Exclusive Gold and Silver Bullion Collection

Editors Picks

Rutland’s ‘Blue Shirts’ return to support businesses, community

June 19, 2026

Kelowna councilllor Ron Cannan launches mayoral campaign, promises focus on public safety

June 18, 2026

Weeknight concerts during Calgary Stampede must end at midnight, city memo says

June 18, 2026

Embracing the “Travel + Sports” Philosophy, JETOUR Supports Global Football Development

June 18, 2026

Latest News

Dance no more: Sherwood Park man’s curbside performance put to an end by RCMP

June 18, 2026

The midterms are going to be a data security nightmare

June 18, 2026

Crypto News: AlphaPepe Plans More CEX Reveals After Azbit as Ethereum Price Prediction Hits $4,000

June 18, 2026
Facebook X (Twitter) Pinterest TikTok Instagram
© 2026 Daily Guardian Canada. All Rights Reserved.
  • Privacy Policy
  • Terms
  • Advertise
  • Contact

Type above and press Enter to search. Press Esc to cancel.

Go to mobile version