Close Menu
Daily Guardian
  • Home
  • News
  • Politics
  • Business
  • Entertainment
  • Lifestyle
  • Health
  • Sports
  • Technology
  • Climate
  • Auto
  • Travel
  • Web Stories
What's On

Bombardier Proudly Shares the 30th Anniversary of Safety Standdown with an Industry-Wide Gathering in Wichita, Kansas

September 21, 2026

Get a closer look at the iPhone 18 Pro’s mechanical camera

September 21, 2026

HyOrc Completes Off-Site Modular Build of First Commercial Waste-to-Methanol Plant Bound for Porto

September 21, 2026

EnBW Deploys XCharge C7 480 kW Fast Chargers Across Its Nationwide Charging Network in Germany

September 21, 2026

Coinstore to List JMDT, Expanding Access to Privacy-Preserving Blockchain Infrastructure

September 21, 2026
Facebook X (Twitter) Instagram
Finance Pro
Facebook X (Twitter) Instagram
Daily Guardian
Subscribe
  • Home
  • News
  • Politics
  • Business
  • Entertainment
  • Lifestyle
  • Health
  • Sports
  • Technology
  • Climate
  • Auto
  • Travel
  • Web Stories
Daily Guardian
Home » An Amazon data center could have the worst polluting power plant in the country
Technology

An Amazon data center could have the worst polluting power plant in the country

By News RoomAugust 8, 20262 Mins Read
An Amazon data center could have the worst polluting power plant in the country
Share
Facebook Twitter LinkedIn Pinterest Email

To power its new West Texas data center, Amazon is investing in the construction of a new power plant that could be one of the largest single producers of greenhouse gases in the US, according to the New York Times. The new gas-burning plant in Pecos County, Texas has received significant investment from Amazon and, at least initially, would not be connected to the state’s power grid. Instead, its 35 natural-gas turbines would primarily deliver its 7.65 gigawatts of electricity to the new data center.

According to Cleanview, which tracks data centers and their associated power projects, GW Ranch received a permit from Texas allowing for the emission of up to 33 million tons of CO2, more than even the largest coal plant in the country. Plants rarely emit as much greenhouse gas as their permits allow, but it’s still notable that the restrictions on its pollution levels are so lax. Amazon has confirmed that it purchased the site and plans to purchase power from GW Ranch.

Even if the GW Ranch site only emits a portion of the greenhouse gases it’s permitted to, it would still represent a significant setback for Amazon’s Climate Pledge. Jeff Bezos pledged to make his company carbon neutral by 2040. However, its emissions have climbed for several years in a row due to the demands of AI. Amazon spokeswoman Margaret Callahan told the New York Times that, “The world looks different now than when we co-founded the climate pledge,” but that, “our commitment hasn’t changed.”

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email

Keep Reading

Get a closer look at the iPhone 18 Pro’s mechanical camera

Amazon doesn’t trust Meta’s Muse AI agent

Kojima Productions disputes reports the studio is in trouble

No one is surprised that Nvidia’s Jensen Huang thinks AI fears are overblown.

A great new video game movie

Meta’s Muse is creepy, but maybe not for the reasons you think

Gemini went rogue, hacked three companies, and Google hid it

It’s not just LG. Every TV company is spying on you

The AI regulation smackdown isn’t over

Editors Picks

Get a closer look at the iPhone 18 Pro’s mechanical camera

September 21, 2026

HyOrc Completes Off-Site Modular Build of First Commercial Waste-to-Methanol Plant Bound for Porto

September 21, 2026

EnBW Deploys XCharge C7 480 kW Fast Chargers Across Its Nationwide Charging Network in Germany

September 21, 2026

Coinstore to List JMDT, Expanding Access to Privacy-Preserving Blockchain Infrastructure

September 21, 2026

Latest News

Winfield LLC Announces Launch of SweepBurger.com, a Free-to-Play Sweepstakes Casino With Notifications for New Sweepstakes

September 21, 2026

Canadian Designers Unite in Harmony as Cashmere Collection Announces its 2026 Roster

September 21, 2026

Zoomex to Host Traders After Party During TOKEN2049 Singapore, Connecting Traders and the Web3 Community

September 21, 2026
Facebook X (Twitter) Pinterest TikTok Instagram
© 2026 Daily Guardian Canada. All Rights Reserved.
  • Privacy Policy
  • Terms
  • Advertise
  • Contact

Type above and press Enter to search. Press Esc to cancel.

Go to mobile version