Close Menu
Daily Guardian
  • Home
  • News
  • Politics
  • Business
  • Entertainment
  • Lifestyle
  • Health
  • Sports
  • Technology
  • Climate
  • Auto
  • Travel
  • Web Stories
What's On

Greywolf Therapeutics appoints Edwin Moses as Chair

April 16, 2026

Appointments in Suominen Leadership Team

April 16, 2026

Trump signs several pipeline permits to facilitate Canada-U.S. oil transport

April 16, 2026

Periculum Security Group Achieves ISO 27001 Certification, Reinforcing Its Commitment to Information Security

April 16, 2026

North Vancouver chlorine plant expansion rejection raises drinking water concerns

April 15, 2026
Facebook X (Twitter) Instagram
Finance Pro
Facebook X (Twitter) Instagram
Daily Guardian
Subscribe
  • Home
  • News
  • Politics
  • Business
  • Entertainment
  • Lifestyle
  • Health
  • Sports
  • Technology
  • Climate
  • Auto
  • Travel
  • Web Stories
Daily Guardian
Home » Acrow Provides Permanent Replacement for Blakeney Bridge in Ontario
Press Release

Acrow Provides Permanent Replacement for Blakeney Bridge in Ontario

By News RoomSeptember 17, 20254 Mins Read
Acrow Provides Permanent Replacement for Blakeney Bridge in Ontario
Share
Facebook Twitter LinkedIn Pinterest Email

TORONTO, Sept. 17, 2025 (GLOBE NEWSWIRE) — Acrow, a leading international bridge engineering and supply company, announced today it has designed and supplied two modular steel bridges to permanently replace the aging Blakeney Bridge in Lanark, Ontario. After learning of a neighbouring township’s success using a cost-effective panel bridge in a similar project, Lanark County officials believed the same solution would be their best option. In addition to the economic savings and a shorter construction timeline, the versatility of the structure could accommodate the community’s future needs.

The original single-lane crossing was built in 1915 and consisted of three separate structures spanning the Mississippi River via two islands. Situated in a rural area, the bridge is considered critical for enhancing accessibility for farmers, area residents, and tourists, and has been repaired or rehabilitated over the years, including a major project in 2000 to extend the life of the structure. When planning for a replacement began and after a competitive tender process, Acrow was awarded the contract.

One of the structures supplied is a 15-bay bridge with an overall length of 45.57 meters (150’). The second bridge, a single span, has a length of 27.36 meters (90’). Each structure has a custom two-lane roadway width of 7.92 meters (26’). Both bridges have a crowned asphalt overlay deck surface and are designed to a Live Load of CL-625-ONT Truck or Lane Load as per Canadian Highway Bridge Design Code S6-19.

Acrow proposed an innovative and cost-effective launch method to the contractor, Looby Construction, which entailed installing the longer two-span bridge first with a cantilever launch, using parts from the single-span bridge. Once the longer two-span bridge was in place, the single-span bridge was installed with a crane-assisted launch, thereby eliminating the need for additional launching equipment. The structure was officially opened at a ribbon-cutting ceremony on June 17, 2025.

“Acrow’s modular panel bridges proved to be an ideal solution for this project,” said Betul Oliver, Acrow’s Business Development Manager for Eastern Canada. “The versatility of our solutions on projects like this allows Acrow to accommodate a wide range of lengths, widths and strengths, and the ease and speed of assembly helps reduce overall project costs.”

“Acrow played an instrumental role on this project by providing detailed information and budget estimates for modular bridge solutions, empowering the council to make an informed decision,” said Sean Derouin, Director of Public Works at Lanark County. “The Acrow team was outstanding from fabrication through to final installation. Although high water levels delayed the bridge’s reopening, the assembly and installation went smoothly. Throughout the project, Acrow worked in partnership with Looby Construction to provide consistent project support, and the County of Lanark is extremely satisfied with the outcome.”

“Once again, Acrow is proud to have been a part of this important project to upgrade Ontario’s transportation infrastructure,” said Oliver Radack, Acrow Canada’s Director of Business Development and Operations. “Particularly for projects in rural or remote locations, Acrow’s compact modular bridging systems can offer a significantly superior alternative to traditional bridge construction, and we are delighted to have worked with Lanark County on this prestigious project in service to local communities.”

About Acrow
Acrow has been serving the transportation and construction industries for more than 70 years with a wide range of modular steel bridging solutions for permanent, temporary, military and emergency use. Acrow’s extensive international presence includes leadership in the development and implementation of bridge infrastructure projects in over 150 countries across Africa, Asia, the Americas, Europe and the Middle East. For more information, please visit www.acrow.com.

Media contact:
Tracy Van Buskirk
Marketcom PR
Main: (212) 537-5177, ext. 8; Mobile: (203) 246-6165
[email protected]

A photo accompanying this announcement is available at: 

https://www.globenewswire.com/NewsRoom/AttachmentNg/1db827ab-1d37-4a96-ad3b-3f572fabd5b0

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email

Keep Reading

Greywolf Therapeutics appoints Edwin Moses as Chair

Appointments in Suominen Leadership Team

Periculum Security Group Achieves ISO 27001 Certification, Reinforcing Its Commitment to Information Security

How RUDSAK’s Outerwear Expertise Continues to Drive Brand Momentum

Assure Scratch and Dent Targets National Expansion as Subscription Car Repair Demand Grows

Farmer Brown Expands Access to Builders Risk, Home, and Auto Coverage With Faster Quotes and Competitive Rates for Contractors and Property Owners

Tamas Piros Launches “Invisible AI” Program for Heritage Luxury Houses

OPPEIN Completes Intelligent Manufacturing Upgrade to Enhance Global Project Delivery

TOKYOPOP Launches Reg CF Raise, Inviting Fans to Own a Piece of the Company That Built Western Manga Market

Editors Picks

Appointments in Suominen Leadership Team

April 16, 2026

Trump signs several pipeline permits to facilitate Canada-U.S. oil transport

April 16, 2026

Periculum Security Group Achieves ISO 27001 Certification, Reinforcing Its Commitment to Information Security

April 16, 2026

North Vancouver chlorine plant expansion rejection raises drinking water concerns

April 15, 2026

Latest News

How RUDSAK’s Outerwear Expertise Continues to Drive Brand Momentum

April 15, 2026

Saskatchewan municipal leaders gather for annual SUMA bear pit

April 15, 2026

Assure Scratch and Dent Targets National Expansion as Subscription Car Repair Demand Grows

April 15, 2026
Facebook X (Twitter) Pinterest TikTok Instagram
© 2026 Daily Guardian Canada. All Rights Reserved.
  • Privacy Policy
  • Terms
  • Advertise
  • Contact

Type above and press Enter to search. Press Esc to cancel.

Go to mobile version