Close Menu
Daily Guardian
  • Home
  • News
  • Politics
  • Business
  • Entertainment
  • Lifestyle
  • Health
  • Sports
  • Technology
  • Climate
  • Auto
  • Travel
  • Web Stories
What's On

The $200 Popcorn Popper That Keeps Selling Out

October 1, 2026

Challenged Athletes Foundation Receives Rings of Gold Award from U.S. Olympic & Paralympic Committee

October 1, 2026

CleanChoice Energy Closes Approximately $166M in Project Financing and Tax Equity for Two Solar Projects

October 1, 2026

Fabletics Launches Fabletics Reserve Credit Card, Expanding Value and Loyalty Perks to Its More than 2.7 Million Members

October 1, 2026

First Merchants Bank CEO Mark Hardwick to retire at the end of 2026 and President Mike Stewart to become President and CEO

October 1, 2026
Facebook X (Twitter) Instagram
Finance Pro
Facebook X (Twitter) Instagram
Daily Guardian
Subscribe
  • Home
  • News
  • Politics
  • Business
  • Entertainment
  • Lifestyle
  • Health
  • Sports
  • Technology
  • Climate
  • Auto
  • Travel
  • Web Stories
Daily Guardian
Home » Acrow Bridge Solution to Provide a Temporary Route During Major Motorway Construction in County Cork, Ireland
Press Release

Acrow Bridge Solution to Provide a Temporary Route During Major Motorway Construction in County Cork, Ireland

By News RoomSeptember 9, 20263 Mins Read
Acrow Bridge Solution to Provide a Temporary Route During Major Motorway Construction in County Cork, Ireland
Share
Facebook Twitter LinkedIn Pinterest Email

Modular steel structure will mitigate traffic impacts during the M28 Cork to Ringaskiddy Road Project

Acrow Bridge installation in Cork, Ireland

Acrow Bridge installation in Cork, Ireland

LYDNEY, England and GLOUCESTERSHIRE, England, Sept. 09, 2026 (GLOBE NEWSWIRE) — Acrow Bridge, a leading international bridge design and engineering firm, is pleased to announce one of its modular steel bridges has been installed to provide a temporary detour route during the nationally significant M28 Cork to Ringaskiddy Road Project. Funded by the Department of Transport through Transport Infrastructure Ireland, the project will replace part of the existing N28 with a high-quality motorway connection to Ringaskiddy, improving road safety, reducing congestion, and providing a faster, more reliable route for commuters and commercial traffic. The upgraded corridor will also strengthen access to one of Ireland’s key deep-water ports, supporting Cork’s growing role in European trade and logistics while improving conditions for pedestrians and cyclists.

The temporary detour bridge has been installed on Maryborough Hill Road to maintain traffic while an existing bridge is replaced, which was required to accommodate the widening of the N28, which passes beneath it. An important local arterial route connecting major residential areas with the N28, the N40 South Ring Road and Cork city centre, Maryborough Hill Road carries significant daily traffic. A temporary modular bridge was selected from several alternatives because it will minimize disruption for travelers and maintain access for the local community while enabling construction of the permanent bridge to proceed safely and efficiently.

Acrow’s two-lane bridge was provided as a rental to project contractor BAM UK & Ireland. Bridge components arrived at the site in early June 2026. Because the bridge was to be positioned over an existing dual carriageway, site access was restricted, so the bridge was constructed offline and driven to the lifting position on a Self-Propelled Modular Transporter (SPMT) during a road closure, then lifted into position using the largest mobile crane available in Ireland. The bridge is 42.51 metres (139’) long and 7.32 metres (24’) wide and has two cantilevered pedestrian walkways. It has an epoxy-polyurethane-based anti-skid deck surface and was designed to Eurocode LM1/LM4 loading.

“The M28 project represents a major investment in Ireland’s transportation infrastructure, and we are proud to have been selected to support its successful delivery,” said Laura Jones, Senior Manager, Business Development UK & Ireland at Acrow. “Maintaining safe, reliable traffic flow on such an important corridor throughout construction is essential for local communities, and we are pleased to have provided a solution that helps minimize disruption while this vital improvement project moves forward.”

“With the recent opening of our new facility in Birr, County Offaly, Acrow Bridge Ireland is well positioned to provide rapid delivery and support for temporary bridging projects throughout the country,” added Michael Treacy, CEO Acrow Bridge Ireland. “Combined with the versatility of our modular steel bridge solutions, our local presence enables project owners and contractors to maintain traffic, minimize disruption and keep critical infrastructure projects moving efficiently. We are proud to support a project that will deliver lasting transportation benefits for the people and businesses of Ireland.”

About Acrow
Acrow has been serving the transportation and construction industries for more than 75 years with a wide range of modular steel bridging solutions for permanent, temporary, military and emergency use. Acrow’s extensive international presence includes leadership in the development and implementation of bridge infrastructure projects in over 150 countries across Africa, Asia, the Americas, Europe and the Middle East. For more information, please visit www.acrow.com.

Media contact:
Tracy Van Buskirk
Marketcom PR
Mobile: (203) 246-6165
[email protected]

A photo accompanying this announcement is available at https://www.globenewswire.com/NewsRoom/AttachmentNg/5193ca1d-5767-40bc-b2b0-7d3f4635951d

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email

Keep Reading

The $200 Popcorn Popper That Keeps Selling Out

Challenged Athletes Foundation Receives Rings of Gold Award from U.S. Olympic & Paralympic Committee

CleanChoice Energy Closes Approximately $166M in Project Financing and Tax Equity for Two Solar Projects

Fabletics Launches Fabletics Reserve Credit Card, Expanding Value and Loyalty Perks to Its More than 2.7 Million Members

First Merchants Bank CEO Mark Hardwick to retire at the end of 2026 and President Mike Stewart to become President and CEO

Primech Holdings (Nasdaq: PMEC) Unveils Primech Vision, Integrating a Multi-Robot Facility Fleet and Workforce on One Platform; Live Customer Demonstrations Begin October 2026

Easy Environmental Solutions Ships First Commercial EasyFEN™ System to Kenya

The News Forum Presents Aftershock: The World After October 7, 2023

BloFin returns as TOKEN2049 Singapore title sponsor, opens its “NEXT WHALE ERA” chapter with 3rd anniversary afterparty

Editors Picks

Challenged Athletes Foundation Receives Rings of Gold Award from U.S. Olympic & Paralympic Committee

October 1, 2026

CleanChoice Energy Closes Approximately $166M in Project Financing and Tax Equity for Two Solar Projects

October 1, 2026

Fabletics Launches Fabletics Reserve Credit Card, Expanding Value and Loyalty Perks to Its More than 2.7 Million Members

October 1, 2026

First Merchants Bank CEO Mark Hardwick to retire at the end of 2026 and President Mike Stewart to become President and CEO

October 1, 2026

Latest News

Primech Holdings (Nasdaq: PMEC) Unveils Primech Vision, Integrating a Multi-Robot Facility Fleet and Workforce on One Platform; Live Customer Demonstrations Begin October 2026

October 1, 2026

Police seek answers in crash that killed 2 elders, hurt 2 others on BC First Nation

October 1, 2026

An AI agent tried to hack Canadian government website, researchers say

October 1, 2026
Facebook X (Twitter) Pinterest TikTok Instagram
© 2026 Daily Guardian Canada. All Rights Reserved.
  • Privacy Policy
  • Terms
  • Advertise
  • Contact

Type above and press Enter to search. Press Esc to cancel.

Go to mobile version