Close Menu
Daily Guardian
  • Home
  • News
  • Politics
  • Business
  • Entertainment
  • Lifestyle
  • Health
  • Sports
  • Technology
  • Climate
  • Auto
  • Travel
  • Web Stories
What's On

Halliday’s latest smart glasses feature a much-improved display

July 21, 2026

Arkansas Forestry Division Raises Bar of Fire Tech, Completing OroraTech Trial

July 21, 2026

Prismatic Introduces Native Large Data Sync Capabilities for Customer-Facing Integrations

July 21, 2026

Heelstone Renewable Energy, a Qualitas Energy company, reaches financial close and commences construction of three U.S. solar PV projects backed by long-term PPAs with Meta

July 21, 2026

NFTE and BUILD Announce Merger to Drive Systemic Change in Education

July 21, 2026
Facebook X (Twitter) Instagram
Finance Pro
Facebook X (Twitter) Instagram
Daily Guardian
Subscribe
  • Home
  • News
  • Politics
  • Business
  • Entertainment
  • Lifestyle
  • Health
  • Sports
  • Technology
  • Climate
  • Auto
  • Travel
  • Web Stories
Daily Guardian
Home » The City of Houston selects CDM Smith for engineering design services to expand the East Water Purification Plant
Press Release

The City of Houston selects CDM Smith for engineering design services to expand the East Water Purification Plant

By News RoomJuly 20, 20262 Mins Read
The City of Houston selects CDM Smith for engineering design services to expand the East Water Purification Plant
Share
Facebook Twitter LinkedIn Pinterest Email

HOUSTON, July 20, 2026 (GLOBE NEWSWIRE) — The city of Houston, Texas selected CDM Smith to provide design services for Project 1 of the East Water Purification Plant (EWPP) Enhancement project, estimated at $2.2 billion in construction. The EWPP design phase is scheduled for completion in 2028.

The goal of the project is to expand the capacity of the existing water treatment plant by an additional 360 MGD, implement advanced drinking water treatment processes such as ozone disinfection and biological filtration and plan for future PFAS removal. The EWPP Enhancement project will provide drinking water to support 75 percent of Houston’s population, or 1.8 million residents. Between Houston’s now completed Northeast Water Purification Plant (NEWPP) and EWPP, the two plants will provide drinking water for over 4 million metropolitan residents.

“CDM Smith utilizes innovative applications of tried and proven at-scale technologies and team collaboration to address the city of Houston’s drinking water needs. Our team looks forward to completing the EWPP design and continuing our commitment to Houston to provide a secure water future,” said Randy Rogers, PE, BCEE, project manager and chief engineer.

CDM Smith is a privately owned engineering and construction firm providing legendary client service and smart solutions in water, environment, transportation, energy, and facilities. Passionate about our work and invested in each other, we are inspired to think and driven to solve the world’s environmental and infrastructure challenges.

  • Houston East Water Purification Plant (EWPP) Enhancement Project
            
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email

Keep Reading

Arkansas Forestry Division Raises Bar of Fire Tech, Completing OroraTech Trial

Prismatic Introduces Native Large Data Sync Capabilities for Customer-Facing Integrations

Heelstone Renewable Energy, a Qualitas Energy company, reaches financial close and commences construction of three U.S. solar PV projects backed by long-term PPAs with Meta

NFTE and BUILD Announce Merger to Drive Systemic Change in Education

Integer Technologies, Bedrock Ocean and Liquid Robotics Complete Successful Maritime Autonomy Demonstration for U.S. Navy

Four Nines Gold to Showcase Hayden Hill Opportunity to U.S. Investors at OTC Markets Virtual Investor Conference

Beehive Industries to Expand in Southwest Ohio, Creating Over 200 New Jobs and Investing $70 Million to Scale Production of 3D-Printed Jet Engines

Ygal Arounian Rejoins Wedbush as Managing Director, Equity Research, Internet

Crypto News: MemeToro Releases Integrated Ecosystem Framework for the $MT Utility Token

Editors Picks

Arkansas Forestry Division Raises Bar of Fire Tech, Completing OroraTech Trial

July 21, 2026

Prismatic Introduces Native Large Data Sync Capabilities for Customer-Facing Integrations

July 21, 2026

Heelstone Renewable Energy, a Qualitas Energy company, reaches financial close and commences construction of three U.S. solar PV projects backed by long-term PPAs with Meta

July 21, 2026

NFTE and BUILD Announce Merger to Drive Systemic Change in Education

July 21, 2026

Latest News

Integer Technologies, Bedrock Ocean and Liquid Robotics Complete Successful Maritime Autonomy Demonstration for U.S. Navy

July 21, 2026

Four Nines Gold to Showcase Hayden Hill Opportunity to U.S. Investors at OTC Markets Virtual Investor Conference

July 21, 2026

Fire crews work on containment lines between out-of-control blaze and Kimberley, B.C.

July 21, 2026
Facebook X (Twitter) Pinterest TikTok Instagram
© 2026 Daily Guardian Canada. All Rights Reserved.
  • Privacy Policy
  • Terms
  • Advertise
  • Contact

Type above and press Enter to search. Press Esc to cancel.

Go to mobile version