Close Menu
Daily Guardian
  • Home
  • News
  • Politics
  • Business
  • Entertainment
  • Lifestyle
  • Health
  • Sports
  • Technology
  • Climate
  • Auto
  • Travel
  • Web Stories
What's On

VisitMercerCountyPA Highlights Homecoming Shopping Across Mercer County, Pennsylvania

September 21, 2026

Kimberly A. Boynton Named to NBT Board of Directors

September 21, 2026

Apeing Announces Presale Progress Toward Stage 5 With More Than $100,000 Raised and 460 Million Tokens Sold

September 21, 2026

MemeToro News: $MT Presale Passes $140K as 1,373 Solidity Lines Strengthen Public Fair-Launch Escrow Development This Week

September 21, 2026

Thomas P. Clement Professorship Established at Howard Community College, Anchoring a Growing Engineering Innovation Ecosystem

September 21, 2026
Facebook X (Twitter) Instagram
Finance Pro
Facebook X (Twitter) Instagram
Daily Guardian
Subscribe
  • Home
  • News
  • Politics
  • Business
  • Entertainment
  • Lifestyle
  • Health
  • Sports
  • Technology
  • Climate
  • Auto
  • Travel
  • Web Stories
Daily Guardian
Home » UPDATE — Burgundy Diamond Mines reports first quarter 2025 results
Press Release

UPDATE — Burgundy Diamond Mines reports first quarter 2025 results

By News RoomApril 30, 20254 Mins Read
UPDATE — Burgundy Diamond Mines reports first quarter 2025 results
Share
Facebook Twitter LinkedIn Pinterest Email

CALGARY, Alberta, April 30, 2025 (GLOBE NEWSWIRE) — Burgundy Diamond Mines Limited (ASX:BDM) (Burgundy or the Company) provided the filing of its financial and operating results for the first quarter (Q1-2025) ended March 31, 2025, to the Australian Stock Exchange on April 30, 2025.

During the quarter, Ekati’s operational team fully relocated surface mining equipment to Point Lake and transferred production personnel to the Misery camp.

“This co-location of Point Lake and Misery unlocks improved operational efficiencies, increases effective shift time, and enables a step change downward in mining costs,” said Kim Truter, CEO of Burgundy Diamond Mines.

The transition to Point Lake saw some ore supply disruption due to wet and muddy mining conditions, which have been addressed by the end of the quarter. Misery production was also lower than planned due to cold winter conditions, which froze the ore blanket and inhibited free ore flow through the underground draw points. A targeted campaign to increase production ring drilling, blast the frozen ore, and expand underground haul capacity ensured that Misery production was back on track by the end of the quarter.

“We continue to place a strong focus on strengthening Burgundy’s balance sheet, and I am pleased that we reached an agreement with Macquarie Bank during the quarter for an innovative fuel offtake contract that improves working capital and has potential for a multi-year agreement,” said Truter.

First quarter operational and financial highlights:
All currency unless otherwise noted, is presented in US dollars.

  • Ore tonnes mined: 0.6 million tonnes, decreased by 57% from (Q1-2024: 1.4 million tonnes)
  • Tonnes processed: 0.6 million tonnes, decreased by 46% from (Q1-2024: 1.0 million tonnes)
  • Carats recovered: 0.8 million, decreased by 33% from (Q1-2024: 1.2 million)
  • Carats recovered per tonne processed: 1.4 C/t, increased by 25% from (Q1-2024: 1.1 C/t)
  • Carats sold: 1.2 million from three auctions and other sales events, down 11% from (Q1-2024: 1.3 million)
  • $62/ct. achieved for total proceeds of $73 million (A$116 million)
  • Adjusted EBITDA: $6.5 million; (A$10.3 million)
  • Cash of $38.8 million; (A$61.7 million)

To view the full ASX Q1-2025 quarterly activities report, please visit burgundydiamonds.com/financial-reports.

Note: All figures presented in this release are in US dollars and include performance results and metrics across all of Burgundy’s operations, including Ekati Diamond Mine, the company’s rough diamond sales office in Antwerp, Belgium and diamond cutting and polishing facility in Perth.

About Burgundy Diamond Mines Limited

Burgundy Diamond Mines is a premier independent global scale diamond company focused on capturing the end-to-end value of its unique vertically integrated business model.

Burgundy’s innovative strategy is focused on capturing margins along the full value chain of the diamond industry, including mining, production, cutting and polishing, and the sale of diamonds. By building a balanced portfolio of diamond projects in favourable jurisdictions, including the globally ranked Canadian mining asset, Ekati, and a diamond cutting and polishing facility in Perth, Burgundy has unlocked access to the full diamond value chain. This end-to-end business model with total chain of custody provides traceability along every step of the process, with Burgundy able to safeguard the ethical production of the diamonds from mining to marketing and discovery to design. Burgundy was founded in Perth, Western Australia. The company is led by a world-class management team and Board.

Caution regarding Forward Looking Information

This document contains forward looking statements concerning Burgundy Diamond Mines Limited. Forward looking statements are not statements of historical fact and actual events and results may differ materially from those described in the forward-looking statements as a result of a variety of risks, uncertainties and other factors. Forward looking statements in this document are based on Burgundy’s beliefs, opinions and estimates as of the dates the forward-looking statements are made, and no obligation is assumed to update forward looking statements if these beliefs, opinions or estimates should change or to reflect other future developments.

A photo accompanying this announcement is available at https://www.globenewswire.com/NewsRoom/AttachmentNg/4ad8c3d2-3979-4a9b-8dff-2e49f86e0df2

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email

Keep Reading

VisitMercerCountyPA Highlights Homecoming Shopping Across Mercer County, Pennsylvania

Kimberly A. Boynton Named to NBT Board of Directors

Apeing Announces Presale Progress Toward Stage 5 With More Than $100,000 Raised and 460 Million Tokens Sold

MemeToro News: $MT Presale Passes $140K as 1,373 Solidity Lines Strengthen Public Fair-Launch Escrow Development This Week

Thomas P. Clement Professorship Established at Howard Community College, Anchoring a Growing Engineering Innovation Ecosystem

Toll Brothers Announces Final Opportunity to Own a New Home at Lacamas Hills in Camas, Washington

Schneider Electric finds AI-enabled buildings can cut energy use by up to 22%, save on annual utility costs and carbon

Microdose Tirzepatide: New Study Reports 4.4- to 6.9-Pound Average Weight Loss by Day 59

Zorion Adds Virtual USD Card Issuance to Its Wallet Platform

Editors Picks

Kimberly A. Boynton Named to NBT Board of Directors

September 21, 2026

Apeing Announces Presale Progress Toward Stage 5 With More Than $100,000 Raised and 460 Million Tokens Sold

September 21, 2026

MemeToro News: $MT Presale Passes $140K as 1,373 Solidity Lines Strengthen Public Fair-Launch Escrow Development This Week

September 21, 2026

Thomas P. Clement Professorship Established at Howard Community College, Anchoring a Growing Engineering Innovation Ecosystem

September 21, 2026

Latest News

Oil prices and bond yields give back some of last week’s jumps

September 21, 2026

B.C. government files lawsuit against OpenAI over Tumbler Ridge ‘failure’

September 21, 2026

‘Jersey Shore’ star Nicole ‘Snooki’ Polizzi reveals she’s cancer-free

September 21, 2026
Facebook X (Twitter) Pinterest TikTok Instagram
© 2026 Daily Guardian Canada. All Rights Reserved.
  • Privacy Policy
  • Terms
  • Advertise
  • Contact

Type above and press Enter to search. Press Esc to cancel.

Go to mobile version