Daily Guardian
  • Home
  • News
  • Politics
  • Business
  • Entertainment
  • Lifestyle
  • Health
  • Sports
  • Technology
  • Climate
  • Auto
  • Travel
  • Web Stories
What's On

No evidence entire Pakistan airline crew disappeared in Toronto

December 19, 2025

CHAGEE Releases Inaugural Sustainability Report

December 19, 2025

Poilievre: ‘I’m not fighting for the sake of fighting’

December 19, 2025

Quebec man seeks bail as 1994 murder conviction likely a miscarriage of justice

December 18, 2025

Bitget lists VOOI (VOOI) for Spot Trading

December 18, 2025
Facebook X (Twitter) Instagram
Finance Pro
Facebook X (Twitter) Instagram
Daily Guardian
Subscribe
  • Home
  • News
  • Politics
  • Business
  • Entertainment
  • Lifestyle
  • Health
  • Sports
  • Technology
  • Climate
  • Auto
  • Travel
  • Web Stories
Daily Guardian
Home » Temporary Acrow Bridge Installed to Maintain Access to Local Village of Craigo During Network Rail Work in Scotland
Press Release

Temporary Acrow Bridge Installed to Maintain Access to Local Village of Craigo During Network Rail Work in Scotland

By News RoomJanuary 29, 20253 Mins Read
Temporary Acrow Bridge Installed to Maintain Access to Local Village of Craigo During Network Rail Work in Scotland
Share
Facebook Twitter LinkedIn Pinterest Email
Temporary Acrow Bridge Installed to Maintain Access to Local Village of Craigo During Network Rail Work in Scotland

LYDNEY, United Kingdom, Jan. 29, 2025 (GLOBE NEWSWIRE) — Acrow Bridge, a leading international bridge engineering and supply company, has announced one of its modular steel bridges has been installed on Craigo Road in the village of Craigo, Montrose, Scotland, during a Network Rail project to replace the bridge over the railway line between Dundee and Aberdeen. Once the existing bridge was closed, the only remaining access to the village of Craigo was via a 3-tonne weight-restricted bridge, making access for most traffic, including emergency response vehicles and refuse trucks, impossible. Consequently, the decision was made to install a temporary modular vehicular bridge from Acrow to mitigate the impact of the project.

Construction on the £3m project began in September 2024, with the first phase the installation of the temporary bridge and the associated diverted access road and footpath. The project is expected to last six months and will result in a new permanent bridge that will better support the weight of the traffic over the railway.

Acrow’s modular steel bridge was hired to AmcoGiffen, a principal contractor to Network Rail. The bridge is a 33-metre-long Acrow 700XS® modular panel bridge with a road width of 4.2 metres and an additional 1-metre-wide external, cantilevered footwalk. Made from 100% steel with epoxy resin anti-skid coated decks, the bridge is designed to carry Eurocode LM1 and LM2 traffic as well as a diverted water pipe.

The bridge was delivered to the site on November 18 and fully assembled within days, then lifted into position with a 750-tonne crane during an overnight rail possession on November 30. Once in position, AmcoGiffen installed Network Rail-compliant edge protection behind the parapets on both the bridge and the footwalk. Acrow’s bridge is expected to be in place until the new permanent bridge is reopened.

“Easily assembled and rapidly installed, Acrow’s cost-effective temporary bridge was the perfect solution for this important project,” said Laura Jones, Acrow’s UK Business Development Manager. “When minimizing the impact of bridge construction is a priority, Acrow can help deliver projects quickly, safely and efficiently.”

Added Michael Treacy, CEO of Acrow Global Limited, “Transportation agencies, contractors and engineering firms worldwide rely on Acrow for rental bridging and the comprehensive services we provide across all phases of a project. Our safe and reliable hire solutions offer our clients great versatility and can help keep projects on or ahead of schedule.”

About Acrow

Acrow has been serving the transportation and construction industries for more than 70 years with a wide range of modular steel bridging solutions for permanent, temporary, military and emergency use. Acrow’s extensive international presence includes leadership in the development and implementation of bridge infrastructure projects in over 150 countries across Africa, Asia, the Americas, Europe and the Middle East. For more information, please visit www.acrow.com.

Media contact:
Tracy Van Buskirk
Marketcom PR
Main: (212) 537-5177, ext. 8; Mobile: (203) 246-6165
[email protected]

A photo accompanying this announcement is available at https://www.globenewswire.com/NewsRoom/AttachmentNg/8d7b5002-0eb0-4f9d-8f6f-930498581e0b

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email

Keep Reading

CHAGEE Releases Inaugural Sustainability Report

Bitget lists VOOI (VOOI) for Spot Trading

Faraday Future Plan to Complete FF 91 2.0 Delivery and Transaction Process with ZEVO CEO Hebron Sher on December 22, with a Delivery Ceremony in January 2026

Wreaths Across America Presents the 2025 Founder’s Award Posthumously to Veteran and Volunteer Patrick Palmersheim of Iowa

CT3 reaches the final phase of beta testing for its next-generation decentralised storage system

Urbanica Debuts Next Generation Standing Desks Inspired by Movement Science for Improved Daily Energy and Focus

Remote Tank Monitoring (RTM) Market Outlook 2025-2029: Otodata and Anova Dominate Globally with Acquisitions and Innovation

FlareFlow Adds Blockbuster Titles to COL Group International’s Microdrama Licensing Catalogue

Paradox Vancouver Presents “Midnight Unmasked”

Editors Picks

CHAGEE Releases Inaugural Sustainability Report

December 19, 2025

Poilievre: ‘I’m not fighting for the sake of fighting’

December 19, 2025

Quebec man seeks bail as 1994 murder conviction likely a miscarriage of justice

December 18, 2025

Bitget lists VOOI (VOOI) for Spot Trading

December 18, 2025

Subscribe to News

Get the latest Canada news and updates directly to your inbox.

Latest News

Former Saskatoon principal Duff Friesen gets six-month conditional sentence

December 18, 2025

Faraday Future Plan to Complete FF 91 2.0 Delivery and Transaction Process with ZEVO CEO Hebron Sher on December 22, with a Delivery Ceremony in January 2026

December 18, 2025

Google’s Gemini app can check videos to see if they were made with Google AI

December 18, 2025
Facebook X (Twitter) Pinterest TikTok Instagram
© 2025 Daily Guardian Canada. All Rights Reserved.
  • Privacy Policy
  • Terms
  • Advertise
  • Contact

Type above and press Enter to search. Press Esc to cancel.

Go to mobile version