Close Menu
Daily Guardian
  • Home
  • News
  • Politics
  • Business
  • Entertainment
  • Lifestyle
  • Health
  • Sports
  • Technology
  • Climate
  • Auto
  • Travel
  • Web Stories
What's On

Tumbler Ridge, B.C., and Taber, Alta. named top 2 Hockeyville finalists

March 22, 2026

Alberta trucker convicted of child luring in U.S. to be sentenced in April

March 22, 2026

A close-up look at the service dogs who make life better in Saskatchewan

March 22, 2026

Parts of Nova Scotia, Quebec get early spring blast of snow

March 22, 2026

Canadians on humanitarian mission in Cuba say residents ‘tired’ amid blackouts

March 22, 2026
Facebook X (Twitter) Instagram
Finance Pro
Facebook X (Twitter) Instagram
Daily Guardian
Subscribe
  • Home
  • News
  • Politics
  • Business
  • Entertainment
  • Lifestyle
  • Health
  • Sports
  • Technology
  • Climate
  • Auto
  • Travel
  • Web Stories
Daily Guardian
Home » Acrow’s Modular Steel Bridge Restores Flood-Damaged Route in Remote Montana Wilderness
Press Release

Acrow’s Modular Steel Bridge Restores Flood-Damaged Route in Remote Montana Wilderness

By News RoomDecember 13, 20233 Mins Read
Acrow’s Modular Steel Bridge Restores Flood-Damaged Route in Remote Montana Wilderness
Share
Facebook Twitter LinkedIn Pinterest Email

PARSIPPANY, N.J., Dec. 13, 2023 (GLOBE NEWSWIRE) — Acrow, a leading international bridge engineering and supply company, has noted one of its modular steel bridges was recently installed to restore access to East Rosebud Lake in the Absaroka-Beartooth Wilderness in Montana. The area had been cut off to vehicles since historic flooding in June 2022 caused catastrophic damage to homes, businesses and infrastructure across many areas of the South-Central part of the state.

In Alpine, a community of 67 seasonal cabin owners on East Rosebud Lake, 80 stranded residents were rescued by the Montana National Guard when the bridge on the only route to the area was washed away. In addition, the damaged infrastructure prohibited access to the nearby East Rosebud Campground, a very popular U.S. Forest Service-operated destination for outdoor enthusiasts.

One week after the flood, forest engineers flew over the area and determined that in addition to the washout of the main bridge, three miles of the route had been destroyed. By late summer, a design consultant was hired, and a helicopter equipped with light detection and ranging was able to provide a detailed topographical survey of the damage. Because of the long lead time required to restore the infrastructure permanently, a proposal for the construction of a long-term temporary bridge and road was put out for bid, with Thompson Contractors awarded the project in March 2023.

As reconnecting residents and visitors as quickly as possible was a priority, the U.S. Forest Service selected a modular steel Acrow 700XS® bridge for the project. Rapidly assembled, Acrow’s components are easily delivered to the most remote or challenging locations. The single-lane bridge is 160 feet (48.77m) long and 13 feet, 7 inches (4.14 m) wide, with an epoxy aggregate deck surface, and is designed to HL-93 loading. Acrow’s components arrived at the site in late May, with assembly largely completed in June by the installing contractor, Thompson Contractors. High water conditions delayed the installation of the bridge for several weeks, but when the water receded, the structure was installed with a cantilever launch, using a temporary pier, and opened to traffic on August 4. The bridge is expected to be in place for at least two years until the new bridge is designed and built, at which point Acrow’s bridge will be disassembled and stored by the U.S. Forest Service for future use.

“Acrow’s cost-effective components are in-stock and available for immediate delivery to provide an accelerated, reliable solution to restoring damaged or destroyed infrastructure,” said Kevin Traynor, Acrow’s Business Development Manager, Mountain States. “Available for rent or purchase, they are quickly and easily built and installed, and easily disassembled to facilitate safe, rapid re-deployment.”

Added Eugene Sobecki, Director National Sales and Military Business Development, “Acrow’s ability to provide crucial structural components quickly and economically is built upon our decades of experience in restoring traffic lifelines in emergency situations across the globe. Our proven solutions serve the needs of government agencies and contractors alike.”

About Acrow
Acrow has been serving the transportation and construction industries for more than 70 years with a wide range of modular steel bridging solutions for permanent, temporary, military and emergency use. Acrow’s extensive international presence includes leadership in the development and implementation of bridge infrastructure projects in over 150 countries across Africa, Asia, the Americas, Europe and the Middle East. For more information, please visit www.acrow.com.

Media contact:
Tracy Van Buskirk
Marketcom PR
Main: (212) 537-5177, ext. 8; Mobile: (203) 246-6165
[email protected]

A photo accompanying this announcement is available at https://www.globenewswire.com/NewsRoom/AttachmentNg/e91dcc63-749e-4cd8-9e4d-0c925264fc9d

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email

Keep Reading

Bitcoin Everlight Opens Phase 2 Presale as Shard Activations Continue Across All Three Tiers

Walrus Pump expanding into the European Market

THE CHAMPIONS COLLECTIVE PRESENTS GOTHAM FC’S 2025 NWSL CHAMPIONSHIP RING HONORING SECOND TITLE

HII Celebrates 2025 Graduates of The Newport News Shipbuilding Apprentice School

Bitcoin Everlight Opens Phase 1 of Its Presale With Dual Audit and Dual KYC Verification Already in Place

KosinCapital Announces Expansion of Global Capital Market Service System, Deepening International Investment and Financing Connections

GLOBAL Marks World Down Syndrome Day with Publication of Milestone Review of New Medical Guideline

Wingman P5 by Brook Gaming: True wireless & near-zero latency for native PS5, PS4 & PC gaming

LGI Homes Celebrates Grand Opening of Goldfields Ranch in Linda, California

Editors Picks

Alberta trucker convicted of child luring in U.S. to be sentenced in April

March 22, 2026

A close-up look at the service dogs who make life better in Saskatchewan

March 22, 2026

Parts of Nova Scotia, Quebec get early spring blast of snow

March 22, 2026

Canadians on humanitarian mission in Cuba say residents ‘tired’ amid blackouts

March 22, 2026

Latest News

Musk says he’s building Terafab chip plant in Austin, Texas

March 22, 2026

UNESCO recognizes Maritime historical groups for Black Loyalist archive

March 22, 2026

MPs to question federal budget watchdog nominee as role remains unfilled

March 22, 2026
Facebook X (Twitter) Pinterest TikTok Instagram
© 2026 Daily Guardian Canada. All Rights Reserved.
  • Privacy Policy
  • Terms
  • Advertise
  • Contact

Type above and press Enter to search. Press Esc to cancel.

Go to mobile version