Daily Guardian
  • Home
  • News
  • Politics
  • Business
  • Entertainment
  • Lifestyle
  • Health
  • Sports
  • Technology
  • Climate
  • Auto
  • Travel
  • Web Stories
What's On

Dozens of people allegedly bear-sprayed outside market at Big White Ski Resort

December 16, 2025

How Silicon Valley turned Trump into a fellow broligarch

December 16, 2025

Kelowna transitional housing helps at-risk seniors secure homes

December 16, 2025

Even Trump’s chief of staff was ‘aghast’ at Elon Musk’s deadly USAID cuts

December 16, 2025

Bitget Launches Gold, Forex and Commodities Markets for Crypto Users

December 16, 2025
Facebook X (Twitter) Instagram
Finance Pro
Facebook X (Twitter) Instagram
Daily Guardian
Subscribe
  • Home
  • News
  • Politics
  • Business
  • Entertainment
  • Lifestyle
  • Health
  • Sports
  • Technology
  • Climate
  • Auto
  • Travel
  • Web Stories
Daily Guardian
Home » Giant Magellan Telescope Begins Primary Mirror Support System Testing
Press Release

Giant Magellan Telescope Begins Primary Mirror Support System Testing

By News RoomOctober 15, 20246 Mins Read
Giant Magellan Telescope Begins Primary Mirror Support System Testing
Share
Facebook Twitter LinkedIn Pinterest Email
Giant Magellan Telescope Begins Primary Mirror Support System Testing

TUCSON, Ariz., Oct. 15, 2024 (GLOBE NEWSWIRE) — The Giant Magellan Telescope today announced the successful installation of one of its completed 8.4-meter-diameter primary mirrors into a support system prototype at the University of Arizona’s Richard F. Caris Mirror Lab. This highly sophisticated system — comparable in size to half a basketball court and containing three times the number of parts of a typical car — is vital to the telescope’s optical performance and precision control. The milestone marks the start of a six-month optical testing phase to demonstrate that the support system can control the mirror as required, validating the revolutionary capabilities of the telescope’s primary light-collecting surface.

The Giant Magellan’s 368-square-meter light-collecting surface is composed of seven of the world’s largest optical mirrors arranged in a unique flower pattern. Together, they will provide the highest image resolution over the widest field of view ever achieved for the exploration of the Universe — delivering up to 200 times the power of today’s best telescopes. Each primary mirror weighs 17-metric tons and is supported by a highly specialized pneumatic support system which is housed in a steel weldment, or “cell.” This system works with nanometer precision, and is designed to adjust the mirror’s position, stabilize its temperature, protect it from seismic activity, and maintain its precise shape by mitigating mirror sagging from gravity as the telescope moves. The system controls the combined seven primary mirrors to act as a single light-collecting surface, creating the optimal conditions for peak optical performance during scientific observations.

Primary mirror support system prototype integration with completed primary mirror for testing at the University of Arizona Richard F. Caris Mirror Lab. Credit: Damien Jemison, Giant Magellan Telescope–GMTO Corporation

“This work is funded by a National Science Foundation award,” said Barbara Fischer, Primary Mirror Subsystem Manager for the Giant Magellan Telescope. “We began integrating the active support prototype system more than three years ago, and we first used a steel mirror mass simulator to demonstrate that our design was able to safely support and control the completed primary mirror segments. I am honored to work with an extraordinary team, and it is exciting to finally see a completed mirror segment integrated with the cell.”

As a key part of the integration process, Giant Magellan worked closely with Texas A&M University to clean, assemble, and test the support actuators that are being used in the cell. While the actual installation of the mirror into the cell took only one day, the process began with four weeks of disassembly to prepare the cell and support system for transport. The system was then moved 20 miles from the University of Arizona’s Tech Park to the Richard F. Caris Mirror Lab for reassembly. This logistically complex operation occurred a few hours after midnight to minimize traffic disruptions, as the wide-load cell required two road lanes for transport.

“The Giant Magellan Telescope’s primary mirror active support system is the first of its kind,” said Trupti Ranka, Principal Opto-Mechanical Control Systems Engineer for the Giant Magellan Telescope. “The active support system contains an array of approximately 200 actuators and sensors to control the position and shape of the 17-metric tons, 8.4-meter mirror within a fraction of a micron. The control system allows a harmonious operation between the sensor data and actuators to achieve this precision.”

Now that one of the primary mirrors has been successfully integrated with the support system prototype, it will undergo rigorous testing under a metrology tower at the Richard F. Caris Mirror Lab to confirm that the mirror can maintain its shape and performance under various operational conditions. Once testing is complete, the design for the production active support systems will undergo a final design review, and production will commence in 2027.

“This intricate system took years of designing, building, and testing by a team of specialized engineers and technicians,” said Tomas Krasuski, Principal Software and System Test Engineer for the Giant Magellan Telescope. “Every single component was thoroughly tested before integrating it into the system. Now that we’ve installed the mirror segment, we are excited to validate its performance. It has been a challenging yet rewarding process to get here.”

The milestone highlights the next stage of advancement for the Giant Magellan Telescope’s seven primary mirror segments and their support systems. Three of the primary mirror segments are complete, while the remaining four are in various stages of polishing. The seventh and final primary mirror was cast in October 2023 and is now being prepared for polishing. This latest milestone also follows the August 2024 start of the Giant Magellan’s 39-meter-tall telescope mount structure assembly at Ingersoll Machine Tools in Rockford, Illinois, which will support the seven primary mirrors and their cells, adaptive optics, and scientific instruments.

“For the first time, a completed primary mirror segment has been integrated into its support system — this is a giant step in our journey toward first light,” said William Burgett, Project Manager for the Giant Magellan Telescope. “Once its performance is validated, we will begin manufacturing all seven mirror cells at Ingersoll Machine Tools, which will be one of the most exciting advancements to date.”

The Giant Magellan Telescope is now 40% under construction across 36 states and on track to be operational in Chile by the early 2030s.

About
The Giant Magellan Telescope is the future of space exploration from Earth. Using seven of the world’s largest mirrors, the 25.4-meter telescope will produce the most detailed images ever taken of our Universe. It will uncover the cosmic mysteries of dark matter, investigate the origins of the chemical elements, and search for signs of life on distant planets. The Giant Magellan Telescope is the work of the GMTO Corporation, a 501(c)(3) nonprofit and international consortium of 14 universities and research institutions from the United States, Australia, Brazil, Chile, Israel, South Korea, and Taiwan. The telescope is being built in America and will be reassembled and completed in Chile by the early 2030s. The Universe Awaits at giantmagellan.org.

Media Contact
Ryan Kallabis
Giant Magellan Telescope
Director of Communications and Outreach
[email protected]

Multimedia
Multimedia assets and media usage statement available here.

Credits
This milestone is based in part upon work sponsored by the National Science Foundation under Cooperative Agreement Award No. (FAIN) 2332336.

A photo accompanying this announcement is available at https://www.globenewswire.com/NewsRoom/AttachmentNg/8485f435-c07e-4147-9cec-94afbd14e55f

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email

Keep Reading

Bitget Launches Gold, Forex and Commodities Markets for Crypto Users

Faraday Future to Deliver an FX Super One to Ras Al Khaimah Innovation City on December 22, Advancing Deliveries in the Middle East

ALT5 Investor Alert: Hagens Berman Scrutinizing ALT5 Sigma (ALTS) Over Potential Disclosure Violations

EVgo Accelerates Network Expansion with Domestically Made Prefabricated Charging Skids

Vendasta Unveils Custom AI Employees to Redefine the Future of Work for Small Businesses Everywhere

Mutuum Finance (MUTM) Advances Through Roadmap Phase 2 as Phase 6 Enters 99% Allocation

Weight Watchers Launches a Fully Integrated Platform for the GLP-1 Era

Aurigo Unveils Masterworks 2026: Reimagined for Speed, Clarity, and AI-Powered Decision-Making

You Butter Believe It: Butter Consumption Hits Historic High as Yogurt, Cottage Cheese, and Ice Cream Notch Growth in 2024

Editors Picks

How Silicon Valley turned Trump into a fellow broligarch

December 16, 2025

Kelowna transitional housing helps at-risk seniors secure homes

December 16, 2025

Even Trump’s chief of staff was ‘aghast’ at Elon Musk’s deadly USAID cuts

December 16, 2025

Bitget Launches Gold, Forex and Commodities Markets for Crypto Users

December 16, 2025

Subscribe to News

Get the latest Canada news and updates directly to your inbox.

Latest News

Faraday Future to Deliver an FX Super One to Ras Al Khaimah Innovation City on December 22, Advancing Deliveries in the Middle East

December 16, 2025

ALT5 Investor Alert: Hagens Berman Scrutinizing ALT5 Sigma (ALTS) Over Potential Disclosure Violations

December 16, 2025

Edmonton man recreates iconic ‘A Charlie Brown Christmas’ tree

December 16, 2025
Facebook X (Twitter) Pinterest TikTok Instagram
© 2025 Daily Guardian Canada. All Rights Reserved.
  • Privacy Policy
  • Terms
  • Advertise
  • Contact

Type above and press Enter to search. Press Esc to cancel.

Go to mobile version